MySeaTime — Professional Sea‑Service Tracker

Prigorodnoye (RUPGN)

📍 46.6166 N, 142.9000 E 🕐 GMT +11 🌍 Russian Federation

Max Length300 m
Max Beam49 m
Max Draft12 m
Max DWT70,000 T
ISPS✓
ECA✗

📋 Port Overview

✓ ISPS✗ ECA
Prigorodnoye, part of the Sakhalin ll Project, has a crude oil export terminal and liquefied natural gas (LNG) processing plant which has recently commenced operations. LNG is exported from a 805m jetty, via two loading arms and one boil off gas return arm, with vessel loading time estimated at 6-16 hours, depending on size of cargo. A crude oil tanker loading unit (TLU) is located approximately 4.8km from land. Aniva Bay is mainly ice free throughout the year.

🚢 Cargo Capabilities

LiquidGasLng

Load line zone

Summer zone for ships over 100m in length and Winter Seasonal Area for ships of 100m or less in length. Winter Dec 1 to Feb 28/29, Summer Mar 1 to Nov 30.

Location

Prigorodnoye is located in Aniva Bay, on the S coast of Sakhalin Island.

Max size

Harbour: LOA 299.9m, draught 12.0m, beam 49.0m, 88,668DWT Offshore: LOA 249.96, draught 17.5m, 112,723DWT

Traffic figures

Approx 14,000,000t of cargo handled annually.

🔧 Facilities

Bunkering ✓Crew Change ✗

Other ports in Russian Federation

See all Russian Federation ports