Ruwais Port (AERWP)
📍 24.1000 N, 52.7170 E 🕐 GMT +4 🌍 United Arab Emirates
Max Length360 m
Max Beam60 m
Max Draft16.7 m
Max DWT330,000 T
Density1031
ISPS✓
ECA✗
📋 Port Overview
✓ ISPS✗ ECA
The Port of Ruwais, strategically located in the United Arab Emirates, serves as a key maritime gateway for the petroleum industry, with ten specialized terminals operated by the Abu Dhabi National Oil Company (ADNOC). This strategically located port is primarily dedicated to the handling of bulk crude and refined petroleum. ADNOC Onshore operates a dedicated crude oil terminal, while ADNOC Refining oversees two refined oil terminals and a carbon black and delayed coker terminal, ensuring efficient processing and distribution. The port also hosts a gas terminal and an LNG (FSRU) terminal, managed by ADNOC Gas Processing, along with two sulphur handling terminals. Additionally, ADNOC Fertilizers operates a terminal for bulk cargo urea and liquid ammonia, and BOROUGE manages a polyethylene terminal. Operations can be carried out throughout 24 hours on all terminals.
🚢 Cargo Capabilities
ContainerLiquidDry BulkBreakbulkMultipurposePassengerRoroGasLngLpg
Load line zone
Tropical.
Location
Ruwais (alternative name Jabal Az Zannah) includes the oil jetties of Jebel Dhanna, and is located on the Persian Gulf coast approx 220km W of Abu Dhabi, United Arab Emirates.
Max size
Max Harbour: LOA 360m, beam 60.0m, draught 16.7m and 330,000DWT. Max Offshore: LOA 377m, BCM 171.00m, draught 15.9m and 450,000DWT.
Traffic figures
Approx 2,700 vessels handled annually.
🔧 Facilities
Bunkering ✓Fresh Water ✓Stores ✓Repairs ✗24/7 ✓Fumigation ✗Crew Change ✗Visitors ✗
🛡️ Pre-Arrival Information
Communications
..... Ruwais Port Control contact info VHF Ch 09, 16 Call sign "Ruwais Port Control" Telephone +971 2 6021666; +971 2 6021777; +971 2 6021606; +971 2 6021607 Facsimile +971-2-6021600 Email Email: ruwaispc@adnoc.com Jebel Dhanna Port Control contact info VHF Ch 09,16 Telephone +971 2 8772258 Facsimile +971 2 28772483 Harbour Master contact info Telephone +971 2 6021717; +971 2 6021771; +971 2 6021721 Facsimile +971 2 6021700 Email pparuwais@adnoc.ae Pilots contact info VHF Ch 09, 16 Div Mgr, Petroleum Ports Abu Dhabi contact info Telephone +971 2 6023354; +971 2 6023450 Facsimile +971 2 666 0106 Email jalkhamiri@adnoc.ae; smouawine@adnoc.ae Mugharag Port contact info Telephone +971 2 8771380 Facsimile +971 2 8771379 Email mugharag.portcontrol@adpc.ae
Customs and Immigration
Not available.
Documentation required
Before any berthing operations can commence, the ship master should sign and stamp certain initial documents. These documents include: - Vessel declaration by the Master. - Ballast declaration. - Conditions of use of Petroleum Ports terminal facilities. - Safety requirements. Other documents the ship master will be required to submit include: -Crew Lists. - Copy of last port of clearance. - Copy of international tonnage certificate. - Ship safety equipment certificate. ..... General Cargo Vessel Documentation Required: 1. IOPP 2. SOPEP 3. Garbage record book 4. Oil record book part I 5. Document of Compliance (in respect to dangerous goods) 6. Dangerous goods manifest and detailed stowage plan arrival and departure Tanker Vessel Documentation Required: 1. IOPP 2. SOPEP 3. Shipboard marine pollution emergency plan 4. Garbage record book 5. Oil record book part I and II 6. Certificate of Fitness with regard to chemical/gas, including product list 7. Procedures and arrangements manual 8. Cargo record book 9. Ship-Shore Safety checklist 10. Stowage plan arrival and departure 11. Material safety datasheet(s)
ETA
All vessels calling at the port must pass their pre-arrival information at least 72 hours in advance. ETA should be updated 48, 24 and 12 hours prior to arrival. Contact Port Control 4 hours prior to arrival on VHF Ch 16 or 09. Anchoring vessels are advised to contact the Port Control with the following information: Anchoring time (local time) and anchoring position (bearing and distance from Ghasha Lighted Buoy).
Flags
Vessels with Mooring/Loading Master onboard, should by day display the International signal flag "H". Every vessel within the port limits, between sunrise and sunset should fly their national flag and the national flag of the UAE.
General notices & regulations
Vessels over 20 years of age will be subject to a daylight safety inspection at Ghasha Anchorage. Other than age, any vessels with negative or poor air conditioning may be refused entry during the hot summer. Any vessel without an operational or installed AIS system will not be permitted entry to the port. The Port Officer and Mooring Loading Master should be informed before berthing of any special danger or defect with a vessel or port installation or facilities and of any loss, or ejection of the vessel's contents or equipment within the port. All inbound and outbound vessels with a draught greater than 14.0m must submit their UKC and draught information to the Harbour Master prior to required transit. Vessels should not anchor near any submarine pipeline with the port. No vessel is allowed to cast anchor, leave or alter its place of anchorage, fasten or unfasten its moorings within the areas defined. The main engines of all vessels should always be kept ready for immediate use within the port limits except with the express permission of the Port Officer. No repairs should be made to the engine which may hamper the vessels movement without prior written permission for the Port Officer. Master should at all times maintain onboard a sufficient number of seamen to operate the vessel. Loading, ballasting, deballasting, gas release and tank cleaning operations should be stopped during severe lighting storms. Bare lights onboard any vessel are prohibited in the forbidden area. (Refer to articles 15, 22 and 31 of these regulations). The use of electrical bulbs and other equipment capable by electrical floating buoys at any cargo space, pump house or fuel tank or at any other place above the cargo tanks is not permitted onboard tankers in the forbidden area. In case of a fire breaking out onboard the Master should immediately send out signals by prolonged sounding of the vessel's siren and continuous ringing of the vessel's alarm bell. Immediately report the fire breakout to the Port Officer/Terminal Superintendent and the Port Control. No insanitary or noxious materials or goods from any vessel should be deposited at the installation. It is forbidden to move alcoholic beverages from vessel to shore or from shore to any vessel, or from one vessel to another. No person should enter the port limits area unless authorised. No vessels should approach ships in the port within a distance of less than 300m except with the Port Officer's permission. This does not apply to Government vessels. No swimming shall be allowed in port waters. Any person violating these laws shall be punished with imprisonment and fines. Vessels' anchors, chain lengths and sizes must be as per the classification society requirements. Port Charges: Port charges in respect of the vessel to be paid prior to entry into the port. Berthing Conditions and Requirements: ..... 1. All tankers nominated for berthing at the SPM berth should be fitted with equipment employed in the mooring of ships at Single Point Mooring as recommended by OCIMF edition. 2. Berth to SPM is subject to terminal requirements and procedures. 3. Priority of berthing at SPM will be for tankers over 250,000t. 4. All tankers calling Jebel Dhanna Terminal should be fitted with mooring equipment to meet the SOM mooring requirement (Tongue type chain stoppers for 76mm chafing chain for SPM). 5. Tankers to arrive with maximum 3.0m trim by stern. 6. Propeller to be totally immersed whenever possible. 7. No list will be accepted on arrival. 8. The minimum quantity of ballast on arrival of 30% of the SDWT keeping in consideration the channel water depth restriction and underkeel clearance. 9. Tankers with LOA less than 250m will only be accepted at SPM berth subject to Terminal approval. 10. Deck watchman at the forecastle head when the tanker is moored to SPM to report movement against the SPM buoy. 11. Deck watchman at manifold area during loading time. 12. On completion of mooring, a tug boat will be moored to the tanker's stern by means of ship's rope to act as precaution against vessel's drifting and making contact with the SPM buoy.
Health regulations
Maritime Health Declaration completed and signed by Master sent 72hrs with the pre-arrival message, free pratique granted at Ghasha pilot station, while pilot boarding vessel. In case that on board illnesses with flu-like symptoms are reported then the port authorities will request further information. Every vessel, upon arrival by day from a foreign port, should exhibit the international signals requesting free pratique. This does not apply to vessels suspected of infection or infected, under any orders of laws in force, which vessels shall be subject to the rules governing quarantine for persons and animals and to provision of such orders of law. Compulsory pratique: No vessels, other than exempted vessels, should be permitted to approach or leave the port limits without the presence of the Mooring/Loading Master onboard unless otherwise ordered by the Port Officer. There are no facilities for deratting at Ruwais.
Notices of readiness
To be tendered on arrival at pilot station.
Standard messages
LPG CARRIERS: Please provide the following information at least 72 hours in advance and in the same sequential order to: Petroleum Ports Authority, Ruwais and Jebel Dhanna. Update ETA 48, 24 hours prior to arrival, contact Das Marine on VHF Ch 16, 09, 4 hours before arrival. Please have combination pilot accommodation ladder rigged on the lee side. Pratique will be granted by the Berthing Master on boarding. ..... Part 1: A. Name of vessel B. ETA Ruwais and Jebel Dhanna C. Port of Registry D. Nationality E. NT F. GT G. Summer deadweight H. IMO No I. Master's name J. Year built Part 2: A. Voyage number B. Cargo to load, loading rates C. Last port D. Next port E. Destination port for discharge F. Last port in the UAE and date G. Confirm your acceptance to signing a boycott declaration to be submitted to the Supreme Petroleum Council stating that the cargo loaded at Jebel Dhanna/Ruwais will not be discharged at any port in Israel or any other boycotted countries. Part 3: Expiry dates of the following certificates: A. Load Line B. Safety Construction C. Safety Equipment D. Safety Radio Telephone E. Civil Liability (CLC) F. International Oil Pollution Prevention (IOPP) G. Ship Sanitation Control/Ship Sanitation Control Exemption H. Class I. Certificate of fitness for the carriage of liquefied gas J. ISM K. State vessel's P & I Club Note: Non compliance with any conditions on certificates will automatically cancel the validity of the certificate. Part 4: Ballast to be discharged this port A. Segregated ballast quantity B. Dedicated ballast quantity C. Clean ballast quantity D. State time to deballast before loading or whether operations will be concurrent. Part 5: A. Confirm all cargo tanks are fully inerted with oxygen content below 8%. B. Confirm vessel has no defects which could affect the safe navigation or manoeuvrability of the vessel. C. Confirm that the cargo system is free from defects or leaks which could affect cargo handling. D. Confirm accommodation air conditioning/ventilating systems are operational with positive pressure and temperature below 26°C. E. Confirm vessel will operate under closed loading conditions with venting of cargo tanks only by means of approved venting systems. Part 6: A. Arrival displacement B. Arrival draught C. Sailing draught D. Length overall E. Length bow to manifold F. Freeboard on arrival G. Maximum freeboard during operations H. Distance manifold to ships side I. Height of manifold above deck J. Confirm manifold suitable for connections of 16in hoses Part 7: A. Number, size and material of headlines B. Number, size and material of forward breastlines C. Number, size and material of forward springs D. Number, size and material of aft springs E. Number, size and material of aft breastlines F. Number, size and material of sternlines G. Confirm mooring and winches inspected and in good condition H. Date of last winch brake test I. Confirm moorings on drum are spooled in the correct direction Part 8: SPM Moorings A. Type and size (horizontal and vertical dimensions) of forward Panama fairlead or chock. B. Number, type and safe working load of bow stopper, confirm suitable for 3in chain. C. Safe working load of port crane derrick. PENTANE PLUS: Please provide the following information at least 72 hours in advance and in the same sequential order to: Petroleum Ports Authority, Ruwais and Jebel Dhanna. Update ETA 48, 24 hours prior to arrival, contact Das Marine on VHF Ch 16, 09, 4 hours before arrival. Please have combination pilot accommodation ladder rigged on the lee side. Pratique will be granted by the Berthing Master on boarding. ..... Part 1: A. Name of vessel B. ETA Ruwais and Jebel Dhanna C. Port of Registry D. Nationality E. NT F. GT G. Summer deadweight H. IMO No I. Year built J. Master's name Part 2: A. Voyage number B. Cargo to load, loading rates C. Last port D. Next port E. Destination port for discharge F. Last port in the UAE and date G. Confirm your acceptance to signing a boycott declaration to be submitted to the Supreme Petroleum Council stating that the cargo loaded at Das Island will not be discharged at any port in Israel or any other boycotted countries. Part 3: Expiry dates of the following certificates: A. Load Line B. Safety Construction C. Safety Equipment D. Safety Radio Telegraph E. Safety Radio Telephone F. Civil Liability (CLC) G. International Oil Pollution Prevention (IOPP) H. Ship Sanitation Control/Ship Sanitation Control Exemption I. Class J. ISM K. State vessel's P & I Club Note: Non compliance with any conditions on certificates will automatically cancel the validity of the certificate. Part 4: A. Segregated ballast quantity B. Dedicated ballast quantity C. Clean ballast quantity D. State time to deballast before loading or whether operations will be concurrent. Part 5: A. Confirm all cargo tanks are fully inerted with oxygen content below 8%. B. Confirm vessel has no defects which could affect the safe navigation or manoeuvrability of the vessel. C. Confirm that the cargo system is free from defects or leaks which could affect cargo handling. D. Confirm accommodation air conditioning/ventilating systems are operational with positive pressure E. Confirm vessel will operate under closed loading conditions with venting of cargo tanks only by means of approved venting systems. Part 6: A. Arrival displacement B. Arrival draught C. Sailing draught Part 7: A. Number size and material of headlines B. Number, size and material of forward breastlines C. Number, size and material of forward springs D. Number, size and material of aft springs E. Number, size and material of aft breastlines F. Number, size and material of sternlines G. Confirm mooring and winches inspected and in good condition H. Date of last winch brake test I. Confirm moorings on drum are spooled in the correct direction OIL: Please provide the following information at least 72 hours in advance and in the same sequential order to: Petroleum Ports Authority, Ruwais and Jebel Dhanna. Update ETA 48, 24 hours prior to arrival, contact Das Marine on VHF Ch 16, 09, 4 hours before arrival. Please have combination pilot accommodation ladder rigged on the lee side. Pratique will be granted by the Berthing Master on boarding. ..... Part 1: A. Name of vessel B. Year built C. ETA Ruwais and Jebel Dhanna D. Port of Registry E. Nationality F. NT G. GT H. Summer deadweight I. IMO No J. Master's name Part 2: A. Voyage number B. Cargo to load, loading rates C. Last port D. Next port E. Destination port for discharge F. Last port in the UAE and date G. Confirm your acceptance to signing a boycott declaration to be submitted to the Supreme Petroleum Council stating that the cargo loaded at Ruwais and Jebel Dhanna will not be discharged at any port in Israel or any other boycotted countries. Part 3: Expiry dates of the following certificates: A. Load Line B. Safety Construction C. Safety Equipment D. Safety Radio Telegraph E. Safety Radio Telephone F. Civil Liability (CLC) G. International Oil Pollution Prevention (IOPP) H. Ship Sanitation Control/Ship Sanitation Control Exemption I. Class J. ISM K. State vessel's P & I Club Note: Non compliance with any conditions on certificates will automatically cancel the validity of the certificate. ..... Part 4: Ballast to be discharged this port A. Segregated ballast quantity B. Dedicated ballast quantity C. Clean ballast quantity D. State time to deballast before loading or whether operations will be concurrent. Part 5: A. Confirm all cargo tanks are fully inerted with oxygen content below 8%. B. Confirm vessel has no defects which could affect the safe navigation or manoeuvrability of the vessel. C. Confirm that the cargo system is free from defects or leaks which could affect cargo handling. D. Confirm accommodation air conditioning/ventilating systems are operational with positive pressure, temperature below 26°C. E. Confirm vessel will operate under closed loading conditions with venting of cargo tanks only by means of approved venting systems. Part 6: A. Arrival displacement B. Arrival draught C. Sailing draught D. Length overall E. Length bow to manifold F. Freeboard on arrival G. Maximum freeboard during operations H. Distance manifold to ships side I. Height of manifold above deck J. Confirm manifold suitable for connections of 16in hoses Part 7: A. Number, size and material of headlines B. Number, size and material of forward breastlines C. Number, size and material of forward springs D. Number, size and material of aft springs E. Number, size and material of aft breastlines F. Number, size and material of sternlines G. Confirm mooring and winches inspected and in good condition H. Date of last winch brake test I. Confirm moorings on drum are spooled in the correct direction Part 8: SPM Moorings A. Type and size (horizontal and vertical dimensions) of forward Panama fairlead or chock. B. Number, type and safe working load of bow stopper, confirm suitable for 3in chain. C. Safe working load of port crane derrick. SULPHUR: Please provide the following information at least 72 hours in advance and in the same sequential order to: Petroleum Ports Authority, Ruwais and Jebel Dhanna. Update ETA 48, 24 hours prior to arrival, contact Das Marine on VHF Ch 16, 09, 4 hours before arrival. Please have combination pilot accommodation ladder rigged on the lee side. Pratique will be granted by the Berthing Master on boarding. ..... Part 1: A. Name of vessel B. Year built C. ETA Ruwais and Jebel Dhanna D. Port of Registry E. Nationality F. NT G. GT H. Summer deadweight I. IMO No J. Master's name Part 2: A. Voyage number B. Cargo to load, loading rates C. Last port D. Next port E. Destination port for discharge F. Last port in the UAE and date G. Confirm your acceptance to signing a boycott declaration to be submitted to the Supreme Petroleum Council stating that the cargo loaded at Ruwais and Jebel Dhanna will not be discharged at any port in Israel or any other boycotted countries. Part 3: Expiry dates of the following certificates A. Load Line B. Safety Construction C. Safety Equipment D. Safety Radio Telegraph E. Safety Radio Telephone F. Civil Liability (CLC) G. International Oil Pollution Prevention (IOPP) H. Ship Sanitation Control/Ship Sanitation Control Exemption I. Class J. ISM K. State vessel's P & I Club Note: Non compliance with any conditions on certificates will automatically cancel the validity of the certificate. ..... Part 4: Ballast to be discharged this port A. Segregated ballast quantity to be discharged Part 5: A. Advise if cargo tanks inerted or gassed up B. Confirm hold spaces inerted with positive pressure C. Confirm vessel has no defects which could affect the safe navigation or manoeuvrability of the vessel. D. Confirm that the cargo system is free from defects or leaks which could affect cargo handling. E. Confirm accommodation air conditioning/ventilating systems are operational with positive pressure. Temperature below 25°C. Part 6: A. Arrival displacement B. Arrival draught C. Sailing draught D. Length overall E. Max arrival freeboard F. BOW/CM Part 7: A. Number, size and material of headlines B. Number, size and material of forward breastlines C. Number, size and material of forward springs D. Number, size and material of aft springs E. Number, size and material of aft breastlines F. Number, size and material of sternlines G. Confirm mooring and winches inspected and in good condition H. Date of last winch brake test I. Confirm moorings on drum are spooled in the correct direction
⚓ Terminals & Berths
44 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| ADNOC Fertilizers Terminal 24.1383333, 52.7374333 | Both | — | — | — | — |
OperatorADNOC Fertilizers | |||||
| ADNOC Sulphur Handling Terminal 1 24.1456, 52.7374333 | Both | — | — | — | — |
OperatorADNOC Gas Processing | |||||
| Berth 1 24.1514167, 52.7343167 | Both | 225 m | 12 m | 75,000 T | Active |
Mooring SpecsContinuous: 660 m Flat Side: 330 m Side: Port Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorADNOC Fertilizers | |||||
| Berth 2 24.1536167, 52.7339167 | Both | 199.99 m | 12 m | 63,500 T | Active |
Mooring SpecsContinuous: 660 m Side: Port or Starboard Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorADNOC Fertilizers | |||||
| No. 1 24.1495333, 52.7360167 | Both | 220 m | 11.4 m | 58,750 T | Active |
Mooring SpecsFlat Side: 15 m Side: Port Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorADNOC Gas Processing | |||||
| 1 24.1396333, 52.7494 | Dry Cargo | — | 4.2 m | — | Never Existed |
Mooring SpecsFlat Side: 185 m OperatorIRSHAD (Abu Dhabi Petroleum Ports Operation Co) | |||||
| 2 24.13945, 52.7480667 | Dry Cargo | — | 4.2 m | — | Never Existed |
Mooring SpecsFlat Side: 125 m OperatorIRSHAD (Abu Dhabi Petroleum Ports Operation Co) | |||||
| 3 and 4 24.1384333, 52.7481167 | Dry Cargo | — | 4.2 m | — | Never Existed |
Mooring SpecsFlat Side: 198 m OperatorIRSHAD (Abu Dhabi Petroleum Ports Operation Co) | |||||
| ADNOC Sulphur Handling Terminal 2 24.1233333, 52.7774833 | Dry Cargo | — | — | — | — |
OperatorADNOC Gas Processing | |||||
| B-01/02 24.1356333, 52.7512 | Dry Cargo | 180 m | 10.5 m | 24,316 T | Active |
Mooring SpecsFlat Side: 384 m Side: Port Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorAbu Dhabi Polymers Company Ltd. - Borouge | |||||
| B-03/04 24.1373167, 52.7564667 | Dry Cargo | 223 m | 13.5 m | 39,418 T | Active |
Mooring SpecsFlat Side: 500 m Side: Starboard Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorAbu Dhabi Polymers Company Ltd. - Borouge | |||||
| BOROUGE Polyethylene Terminal 24.1353333, 52.7508333 | Dry Cargo | — | — | — | — |
OperatorAbu Dhabi Polymers Company Ltd (BOROUGE) | |||||
| CBDC Berth 24.1536167, 52.6953 | Dry Cargo | 170 m | 12.53 m | 28,515 T | Active |
Mooring SpecsSide: Port Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Carbon Black Delayed Coker (CBDC) Terminal 24.1382333, 52.69045 | Dry Cargo | — | — | — | — |
OperatorADNOC Refining | |||||
| Jebel Dhanna Jetty 24.2135833, 52.5903667 | Dry Cargo | — | — | — | Never Existed |
Mooring SpecsFlat Side: 35 m Cargo HandlingBreakbulk | |||||
| Main Quay (NE) 24.47215, 52.3216333 | Dry Cargo | — | — | — | Never Existed |
Mooring SpecsFlat Side: 120 m | |||||
| No 03 24.1356333, 52.7770333 | Dry Cargo | 258 m | 17.1 m | 93,076 T | Active |
Mooring SpecsSide: Port Gangway: Shore (crew) OperatorADNOC Gas Processing | |||||
| No 04 24.1333167, 52.7795167 | Dry Cargo | 258 m | 17.1 m | 93,361 T | Active |
Mooring SpecsSide: Port Gangway: Shore (crew) OperatorADNOC Gas Processing | |||||
| Quay (SW) 24.4715833, 52.3221333 | Dry Cargo | — | — | — | Never Existed |
Mooring SpecsFlat Side: 46 m | |||||
| Ro-Ro Slipways (South East) 24.1812, 52.5703333 | Dry Cargo | 120 m | 4.5 m | — | Never Existed |
Mooring SpecsFlat Side: 200 m Cargo HandlingBreakbulk OperatorAbu Dhabi Ports | |||||
| Sir Bani Yas Ro-Ro Berth 24.2760833, 52.621 | Dry Cargo | — | — | — | Never Existed |
Mooring SpecsFlat Side: 80 m Cargo HandlingBreakbulk OperatorAbu Dhabi Ports (Western Region) | |||||
| Wharf (South West) 24.1808, 52.5690667 | Dry Cargo | 120 m | 4.5 m | — | Never Existed |
Mooring SpecsFlat Side: 82 m OperatorAbu Dhabi Ports | |||||
| A1 24.1650833, 52.7224667 | Tanker | 320 m | 17 m | 115,414 T | Active |
Mooring SpecsFlat Side: 42 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Gas Processing | |||||
| A2 24.1632167, 52.7253 | Tanker | 260 m | 17 m | 119,950 T | Active |
Mooring SpecsFlat Side: 40 m Side: Port Gangway: Shore (crew) OperatorADNOC Gas Processing | |||||
| A3 24.1613167, 52.72815 | Tanker | 320 m | 17 m | 119,456 T | Active |
Mooring SpecsFlat Side: 42 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Gas Processing | |||||
| ADNOC Gas Processing NGL Terminal 24.1348833, 52.7193333 | Tanker | — | — | — | — |
OperatorADNOC Gas Processing | |||||
| Berth No 2 SPM 24.2157833, 52.6740667 | Tanker | 377 m | 18 m | 450,000 T | Active |
OperatorADNOC Onshore | |||||
| Berth No 3 SPM 24.2021667, 52.6899333 | Tanker | 377 m | 19.2 m | 450,000 T | Active |
OperatorADNOC Onshore | |||||
| Berth No 4 SPM 24.2293333, 52.65815 | Tanker | 377 m | 19.8 m | 450,000 T | Active |
OperatorADNOC Onshore | |||||
| Coastal Berth No 1 24.1609167, 52.71395 | Tanker | 118 m | 8.5 m | 7,281 T | Closed |
Mooring SpecsFlat Side: 41 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Coastal Berth No 2 24.1606333, 52.7136167 | Tanker | 118 m | 8.5 m | 7,112 T | Closed |
Mooring SpecsFlat Side: 41 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Coastal Berth No 3 24.1619333, 52.7128 | Tanker | 118 m | 8.5 m | 7,112 T | Closed |
Mooring SpecsFlat Side: 42 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Coastal Berth No 4 24.1616167, 52.7125 | Tanker | 118 m | 8.5 m | 7,112 T | Closed |
Mooring SpecsFlat Side: 42 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| FSRU 'Express 24.14835, 52.73935 | Tanker | 300 m | 15 m | — | Active |
OperatorADNOC Gas Processing | |||||
| Jebel Dhanna Crude Oil Terminal 24.1704667, 52.6035167 | Tanker | — | — | — | — |
OperatorADNOC Onshore | |||||
| Refinery Berth B 24.1696333, 52.71745 | Tanker | 280 m | 18.5 m | 115,674 T | Active |
Mooring SpecsFlat Side: 100 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Refinery Berth C 24.1722333, 52.7146833 | Tanker | 295 m | 18.8 m | 147,563 T | Active |
Mooring SpecsFlat Side: 85 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Refinery Berth E 24.1750833, 52.7118833 | Tanker | 360 m | 19.6 m | 330,000 T | Active |
Mooring SpecsFlat Side: 100 m Side: Port or Starboard Gangway: Shore (crew) OperatorADNOC Refining | |||||
| Refinery Berth G 24.1819167, 52.7043667 | Tanker | 339.76 m | 19.2 m | 330,000 T | Active |
Mooring SpecsFlat Side: 74 m Side: Port or Starboard Gangway: Shore (crew) OperatorAbu Dhabi Oil Refining Co (TAKREER) | |||||
| Refinery Berth H 24.1845, 52.70165 | Tanker | 332.99 m | 19.2 m | 330,000 T | Active |
Mooring SpecsFlat Side: 72 m Side: Port or Starboard Gangway: Shore (crew) OperatorAbu Dhabi Oil Refining Co (TAKREER) | |||||
| Refinery Berth J 24.1870667, 52.6989 | Tanker | 336 m | 19.2 m | 330,000 T | Active |
Mooring SpecsFlat Side: 72 m Side: Port or Starboard Gangway: Shore (crew) OperatorAbu Dhabi Oil Refining Co (TAKREER) | |||||
| Ruwais LNG Terminal 24.1457333, 52.73925 | Tanker | — | — | — | — |
OperatorADNOC Gas Processing | |||||
| Ruwais Refinery East Terminal 24.1192, 52.72235 | Tanker | — | — | — | — |
OperatorADNOC Refining | |||||
| Ruwais Refinery West Terminal 24.11235, 52.68065 | Tanker | — | — | — | — |
OperatorADNOC Refining | |||||
🏢 Registered Agencies & Contacts
6 contacts registered.
ADNOC
Port OperatorAddress: PO Box 26555, Petroleum Ports Authority, Abu Dhabi, United Arab Emirates
Tel: +971 2 602 5787
Fax: +971 2 877 2483
Email: ppajdrws@emirates.net.ae
Website: https://www.adnoc.ae/en/
Jebel Dhanna/Ruwais Port Auth
Port AuthorityAddress: PO Box 26555, Petroleum Ports Authority, ADNOC, Abu Dhabi, United Arab Emirates
Tel: +971 2 602 1771
Fax: +971 2 602 1700
Email: pparuwais@adnoc.ae
Jebel Dhanna/Ruwais (IRSHAD)
Port OperatorAddress: PO Box 61, Abu Dhabi, United Arab Emirates
Tel: +971 2 602 8000
Fax: +971 2 674 2094
Email: info@irshad.ae
Website: http://www.irshad.ae
Jabal Az Zannah
Port AuthorityIRSHAD - Ruwais
Port OperatorAddress: PO Box 61, Ruwais Industrial Area, Abu Dhabi, United Arab Emirates
Tel: +971 2 602 1611
Fax: +971 2 602 1617
Website: http://www.mwasala.com
Abu Dhabi Polymers Company Ltd
Port OperatorAddress: Al Ruways Industrial City, Abu Dhabi, United Arab Emirates
Tel: +971 2 708 0000
Email: info@borouge.com
✈️ Airports in the Area
Sir Bani Yas Airport
XSB
Sir Bani Yas