Banias Terminal (SYBAN)
π 35.2666 N, 35.9500 E π GMT +2 π Syrian Arab Republic
Max Length240 m
Max Beamβ
Max Draft12 m
Max DWTβ
Density1030
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
The port is currently closed for commercial operations. Information for the port is retained should the port reopen. The port's throughput comprises crude oil, oil products and LPG received from overland pipeline to six MBM moorings.
π’ Cargo Capabilities
Gas
Load line zone
Summer.
Location
Banias Terminal consists of oil pipelines extending from the coast between the S entrance point of Huraysun Bay and the mouth of Nahr Huraysun 1.75nm SSE.
Max size
LOA 281.9m, draught 16.15m, 130,000DWT
π§ Facilities
Bunkering βFresh Water βStores βRepairs β24/7 βCrew Change β
π‘οΈ Pre-Arrival Information
Communications
VHF: Banias Terminal: Ch 16, 13. Callsign "Banias Control". Tel: +963 43 711300. Fax: +963 43 710418. Email: scot50@scs.net.org. Available 24 hours.
Documentation required
Arrival documents: Port Authorities will board and clear the vessel at the anchor area just after berthing. Vessels calling SCOT will require the "free pratique" from the Port Authority by fax through the agent before arrival. ..... Document Copies Maritime Health Declaration 1 Tanker Check List 1 Crew's List 6 Ship's Manifest 2 Crew's Manifest 2 Passenger List 2 Clearance from Last Port of Call 1 Ship's Certificates All in force To carry out unloading operations, SCOT's representatives will in addition receive the following cargo documents: ..... 1. Bill of Lading 2. Vessels Cargo Manifest 3. Certificate of Quantity 4. Certificate of Quality 5. Accompanying Administrative Document (AAD) 6. Certificate of Origin (When origin country is not community) 7. Independent Inspection Report, including: a) Sample's Receipt b) Ullage Report c) OBQ Report d) Vessel's Experience Factor e) Notice of Protest f) Loading Calculation 8. Time Sheet
ETA
To avoid delay on arrival, it is essential for vessels send ETA to terminal and agent (preferably via fax) 72, 48, 24, 12 and 4 hours in advance. Within 6 hours of clearing the last port, vessels bound for the terminal should contact the port with the vessel's name, destination port, summer DWT and arrival draught. Contact should be made to the terminal 2 hours before arriving at the pilot boarding position. Listening watch should be continuous on VHF Ch 16 and 13. ..... ETA notice of 72, 48 and 24 hours should include: 1. Vessel's name 2. ETA 3. Quantity of cargo required and max draught on departure/arrival (24 hours notice only) 4. Cargo grade and quantity 5. Maximum rate of loading/discharging 6. SWL of derrick capacity 7. Specific gravity and temperature 8. Arrival draught and NT 12 hour notice: 9. Vessel's name 10. ETA 4 hours notice (via VHF): 11. Vessel's name 12. Precise time of arrival In the event of a ship having arrived without having contacted Banias Control 4 hrs before ETA, a 4hrs period shall accrue to Banias Terminal before a mooring master boards the vessel. Banias Oil Terminal will not be responsible for any vessel's arrival without prior acceptance or confirmation. (Acceptance should be official and in writing).
General notices & regulations
..... 1. Vessel hoses connecting manifold to be equipped with pressure gauge. 2. When discharging, the pressure at the ship's manifold should not exceed 7kg/cmΠ, within this range of pressure the terminal installations are capable of receiving at various rates depending on berth and storage tanks allocated to the vessel. The Terminal Administration would prefer the vessel's pumps to be rated accordingly, and to be of the centrifugal type. 3. Loading on top slops (LOT) is not acceptable, and slops to be segregated from cargo, as Banias Terminal is not equipped with slops treatment facilities. Pressure gauge to be fitted on vessel's portside connecting manifold. 4. Berthing operations: (Loading/unloading): Will take place only between 0700hrs and 1600hrs LT in summer, ie during daylight, SHINC and weather permitting. Summer starts April1, winter starts October 1. 5. Early Departure Plan: Vessels should leave berth upon completion of loading operations and hoses disconnected, proceeding to anchorage area for signing documents and clearance. Otherwise, the vessel is subject to multiple berthing port dues. 6. Boat ropes to be rigged on either side of vessel and of not less than 4.5in circumference. 7. Derricks and cranes must be capable of plumbing overside abreast of discharging manifold. 8. Loading/discharging manifold: 2 spanners 0.25in, 2 spanners 0.875in, 2 hammers 7lbs, 1 axe 2.5lbs. Hose hang-off bitts are required at approx 3m from the vessel's rail at the loading manifold to secure submarine hoses on the port side. 9. Deck watch: A. continuous watch on deck must be maintained throughout operations, especially towards the shore signal station in position 35Β°13.0'N 035Β°57.0'E, to ensure safe operations and to avoid delays, in addition to a continuous watch on VHF Ch 16. 10. Deck scupper plugs: Deck scuppers must be effectively plugged and on no account should plugs be removed. 11. Vessels in berth: Vessels are not allowed to remain in berth for any reason when loading/discharging is terminated, hoses disconnected and dropped to seabed. 12. Lighting: During hours of darkness, the manifold, the poop, and the mooring area of sea in vicinity of vessel must be adequately lit. 13. Main engines must be kept on short notice. Repairs, which will immobilise must not be carried out in berth. 14. Deck machinery must be ready for immediate use at all times. 15. Whistle or siren to be available at all times. 16. Signalling: An "Aldis" type signalling lamp to be readily available. 17. Stores: It is strictly forbidden for provisions, stores, or other items to be received or disembarked whilst loading/discharging of cargo is in progress. Launches or other craft other than that of terminal must not lie alongside during the said period. 18. Dry Certificate: Master to provide 3 copies of Dry Tank Certificate to shore representative duly signed. 19. Leaving berth due to bad weather: Vessel must let go the mooring ropes in the water and leave berth. The ropes can be collected when weather permits.
Notices of readiness
Tendering Notice of Readiness on arrival will be considered when the vessel arrives in the near vicinity of the Markau Lightbuoy, where the Pilot/Mooring Master will board and stay onboard the vessel during the whole operation. The Mooring Master is the vessel's adviser, and the terminal representative onboard a vessel for all mooring, loading/discharging, unmooring, and communications with shore.
β Terminals & Berths
7 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| No 2 35.2523667, 35.9185833 | Tanker | 281.9 m | 21.9 m | 130,000 T | Closed |
Mooring SpecsSide: Port Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| No 3 35.2458, 35.9215167 | Tanker | 281.9 m | 22.2 m | 130,000 T | Closed |
Mooring SpecsSide: Port Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| No 4 35.23865, 35.9268167 | Tanker | 228.6 m | 18.8 m | 66,000 T | Closed |
Mooring SpecsSide: Port Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| No 5 35.2327333, 35.9254667 | Tanker | 256 m | 18 m | 85,000 T | Closed |
Mooring SpecsSide: Port Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| No 6 35.22625, 35.93075 | Tanker | 213.3 m | 10.36 m | 50,000 T | Closed |
Mooring SpecsSide: Port Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| No 7 35.2199667, 35.9350167 | Tanker | 213.36 m | 8.53 m | 30,000 T | Closed |
Mooring SpecsSide: PORT Gangway: Ship OperatorSCOT (Syrian Company for Oil Transport) | |||||
| SCOT Banias 35.2184833, 35.9653 | Tanker | β | β | β | β |
OperatorSyrian Company for Oil Transport | |||||
π’ Registered Agencies & Contacts
1 contact registered.
Syrian Co for Oil Transport
Port AuthorityAddress: BP 13, Banias, Syria
Tel: +963 43 711300
Fax: +963 43 710418
Email: scot50@scs-net.org
Website: http://www.scot-syria.com/