Abu Marine Terminal (MYABU)
π 6.1333 N, 105.2833 E π GMT +8 π Malaysia
Max Lengthβ
Max Beamβ
Max Draft60 m
Max DWT150,000 T
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
The port is currently closed for commercial operations. Information for the port is retained should the port reopen. The terminal consists of "Abu-A" platform and the FSO vessel "FSO Abu". The export vessel moors in tandem with the FSO and loads via a floating hose on the port side. There are no service facilities available at this location.
π’ Cargo Capabilities
Liquid
Load line zone
Tropical
Location
Abu Oilfield is situated approx 320km off the NE coast of the Malaysian peninsular in the South China Sea.
Max size
150,000DWT, BCM 150m.
π‘οΈ Pre-Arrival Information
Communications
VHF: Abu Marine Terminal: Ch 16, 12. Establish contact when first within VHF range.
Documentation required
The following documents are required on arrival: ..... Document No copies required Crew List 16 Stores List 2 Personal Effects List 2 Passenger List 6 Cargo Manifest 2 Drugs/Narcotics List 4 Arms/Ammunition List 4 Vaccination List 2 Voyage Memo/Itinerary 4 Ship Sanitation Control Certificate 2 Tanker General Information Sheet 2 Last port clearance 1 Tankers trading certificates for inspection 1
ETA
Immediately after having received instructions to proceed to the Abu Marine Terminal, masters are advised to transmit the following information to the terminal: ..... AAA Vessels name, previous name(if any), callsign and flag BBB ETA (local time GMT+8) with ETA confirmed 72, 48 and 24 hours prior to arrival CCC Masters name and nationality DDD GT, NT SDWT, light and full displacement tonnage EEE Last discharge port and intermediate ports FFF Next discharge port and intermediate ports GGG Number of crew and nationality HHH Number of passengers III Grade and quantity of cargo on arrival, previous cargo and cargo to be loaded at Abu Marine Terminal, max loading rate per manifold JJJ Whether previous cargo or any cargo onboard has high sulphur content and concentration in tank vapour spaces KKK Malaysian light dues receipt No and date LLL Arms onboard MMM Confirmation that the tanker is able to load and discharge segregated ballast simultaneously NNN Arrival draughts fore and aft OOO Any leaks which could cause pollution or affect loading PPP Pratique granted: Place/Date. Sickness onboard or clean bill of health QQQ Confirm inert gas system operational and cargo tanks inerted on arrival RRR Confirm cargo heating system operational for all cargo oil tanks All tankers loading at Abu Marine Terminal for the first time to include the following additional information: SSS Length overall and distance from bow to centre of the amidships manifold TTT Confirm a 16in 150ANSI flange is available at port side manifold UUU Confirm compliance to OCIMF Standards of equipment employed in the mooring of ships at single point moorings VVV Confirm centre bow fairlead is not less than 600mm wide and 450mm deep. If not state the length and width. YYY Confirm the pilot ladder will be ready on arrival ZZZ State whether diesel or steam turbine powered
Notices of readiness
Notice of readiness should be presented to the terminal representative when he boards, he is also the pilot/mooring master.
β Terminals & Berths
2 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Abu Marine Terminal 6.125, 105.2883317 | Tanker | β | β | β | β |
| FSO Abu 6.125, 105.288333 | Tanker | β | 60.7 m | β | Closed |
π’ Registered Agencies & Contacts
2 contacts registered.
Ben Line Agencies
Port AgencyPIC: Asrul Sharul
Address: No. 392, First Floor Lorong 1, Taman Sejati 2 32000 Sitiawan, Perak Malaysia
Phone: +60 126833630, +60 56915071