Omisalj (HROMI)
π 45.2166 N, 14.5500 E π GMT +1 π Croatia
Max Length297 m
Max Beam60 m
Max Draft25 m
Max DWT350,000 T
Density0.3-0.5
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
The port is operated as a deep water oil terminal, with two crude oil loading/unloading jetties on the W coast of the bay, with Sepen Bay Petrochemical facility 2.5km to the S.
π’ Cargo Capabilities
LiquidDry BulkBreakbulkGasLngLpg
Load line zone
Summer.
Location
Omisalj is located on the Northern tip of the island of Krk, approx 18km SSE of Rijeka.
Max size
Draught 27.0m, LOA 333.0m, beam 27.0m, 299,999DWT.
π§ Facilities
Bunkering βFresh Water βStores βRepairs βCrew Change β
ποΈ Crane Capacity (TONS)
Up to 2425 β 49
π Pilot Requirements
Body
OMIΠALJ, OTOK KRK 45Β°13.56'N 14Β°32.04'E UNCTAD LOCODE: HR OMI For details see: RIJEKA PILOT REQUIREMENTS ________________________________________________________________________________ ___________
Body2
{
"widget_1_pilotage": {
"area_groups": [
{
"area_name": null,
"pilots_area_description": null,
"pilots_contact_details": [
{
"station_call_name": "Hr Mr",
"vhf_primary_watch": "16",
"vhf_secondary_working": "09 10",
"telephones": [
"+385(0)51 842053",
"+385(0)95 8344597"
],
"faxes": [
"+385(0)51 842219"
],
"emails": [
"li-omisalj@pomorstvo.hr"
],
"websites": [],
"operating_hours": "HX"
}
],
"procedure": {
"compulsory_text_note": "For details see RIJEKA",
"when_to_report": null,
"how_to_report": null,
"what_to_report": [],
"pilot_boarding_positions": [
{
"designator": null,
"coordinates_or_verbose": "45Β°14'99N 14Β°26'72E",
"vessel_particular_constraints": null
}
],
"pilot_disembarkation_positions": [],
"leftover_text_notes": []
}
}
]
},
"widget_2_vts": {
"cross_reference_redirect": null,
"area_groups": [],
},
"widget_3_tugs": {
"contact_details": [],
"availability_hours": null,
"notes": []
},
"widget_4_port_and_notes": {
"port_and_terminal_contacts": [],
"standalone_general_notes": []
},
"formatted_text_original": "PILOTS NOTE: For details see RIJEKA. HOURS:\tH24 PROCEDURE: (1) Pilotage is compulsory for vessels over 500 gt. (2) Pilot ordering: Request for Pilots should be sent via agents together with ETA 72h, 48h and 24h in advance. (3) Pilot boards in position 45Β°14Β·99N 14Β°26Β·72E. ________________________________________________________________________________ ___________ PORT CONTACT DETAILS: Hr Mr VHF Channel: Ch 16; 09 10 Telephone: +385(0)51 842053 +385(0)95 8344597 (Mobile) Fax: +385(0)51 842219 E-mail: li-omisalj@pomorstvo.hr HOURS:\tHX ________________________________________________________________________________ ___________"
}
Body3
WEEKLY CORRECTIONS FROM UKHO NtM WEEK 38/24 Croatian Radio Signals book 2024, (RSDRA2024000134082), 38/24
π‘οΈ Pre-Arrival Information
Communications
Rijeka Radio, callsign "9AR". VHF: Pilots & Port/Terminal: Ch 09, 10, 16. VTS: Vessels are requested to contact VTMS Centre Rijeka, VHF Ch 09 at least 2 hours before arrival. Weather: Weather forecast can be received (in several languages) via VHF Ch 69, available throughout 24 hours.
Customs and Immigration
Customs allowances: Each crew member is allowed 200 cigarettes and a 1 litre bottle of spirit. Penalty for non compliance is confiscation.
Documentation required
..... Document Copies 1. Crew List 6 2. Passenger List 5 3. Stowaway List 3 4. Tobacco/Spirits List 2 5. Stores List 3 6. Arms & Ammunition List 2 7. Narcotics List 2 8. Bills of Lading 2 9. Freight Manifest 3 10. Cargo Manifest 3 11. Transit Cargo Manifest 2 12. Dangerous Cargo Manifest 3 13. Cargo Plan (Hatch List) 2 14. Health Declaration -
ETA
For tankers, ETA is to be sent 72, 48 and 24 hours prior to arrival. All other vessels are to send an ETA 48 and 24 hours prior to arrival. Advanced cargo specification, for vessels carrying dangerous and/or noxious cargo, is to be advised 48 hours prior to arrival and the following information should be included: ..... 1. Dangerous Cargo Report 2. Ballast Reporting Form (can be delivered to the authorities upon arrival at the anchorage or in the port) 3. Notification of Ship Generated Waste 4. ISPS Code (Arrival information) Vessel requirements to participate in the reporting system: Vessels of the following categories are required to send pre arrival notice via Fax, Email or through agent to the harbour master's office: 1. All oil tankers of 150GT and above 2. All vessels of 300GT and above, carrying dangerous cargo or polluting goods, passengers, or in ballast. Military and public vessels have no obligation to make this report. For any additional information visit web site http://www.mmtpr.hr, or contact your local agent. ETA should be sent 24 hour prior to arrival, including the following: 1. Vessel's name, nationality, DWT, draught and LOA 2. Type and quantity of cargo 3. Last port of call and date of departure from the same 4. Estimated time of arrival (date and hour) 5. Origin and quality of cargo 6. Temperature of crude oil in degrees C 7. Actual capacity of tanker discharge pumps Notice of ETD should be given 1 hour before departure of the vessel at the latest.
Flags
If a vessel does not have a Croatian flag onboard the pilot will bring the flag onboard with him if ordered in advance.
General notices & regulations
Night berthing is permitted, but all movements are subject to suitable weather conditions. All vessels berthed at the Omisalj Oil Terminal should comply with valid regulations. Vessels must be encircled with protective floating barriers. Ship crew members are not permitted to move within the Terminal area. Transport of crew members from ship to the gate shall be arranged by Terminal. Stay of tanker in the port: During loading/discharging operations, vessel is permitted to stay in the port for maximum 30 running hours weather permitting except in the case of bad weather conditions (Running Hours Weather Permitting Clause) Sundays and Holidays included. The above stated time shall count from the first mooring line fitted ashore to the slipping of the last mooring line. An additional stay time of 5 hours shall be granted to tankers for tank washing purposes only (COW). Vessels failing to observe the above stated deadlines shall be charged with demurrage costs. Emergency Drill at the Terminal and in the Port: There are situations when vessels and shipowners may be asked, via ship agent, to give their permission for the ship to take part in drills for the case of emergency. Such drills shall be carried out in strict accordance with the organizer's recommendations in order to minimize possible risks. The purpose of the drills is to train and instruct pilots, tugboat skippers, firemen and Terminal's personnel to cope with emergency situations and contingency measures which should be taken in the Port and Terminal. The drills shall be executed in accordance with national regulations. Vessels shall not be charged in case of tug damage. Safety Regulations: Liquid cargo loading and/or discharging should not commence: ..... 1. Before a notice of the vessel's technical readiness for loading/discharging operation, confirming compliance with all safety requirements, has been handed over in writing or by radio by the Master of the tanker to the Loading Master. 2. Until safety check is made by the Loading Master and the vessel officer in charge. 3. If there are not sufficient and adequate fire fighting appliances onboard the tankers. 4. If there is no tug capable of towing the vessel from the Port The master of a tanker shall be responsible for the following safety measures being carried out during loading/discharge operation. He must particularly see that: 1. Funnels are cleaned and fitted with protective net; all other exhaust pipes also fitted with corresponding protective net. 2. Piping and pumps are fully operational, flanges tightly fitted. 3. Scupper plugs on deck are inserted, pumps on port and starboard side connected to the tank for the purpose of collecting the spilled liquid cargo; suitable receptacles placed under pipe joints. 4. Tanks are sealed with the exception of safety valves; tank vents fully operational; fire extinguishing appliances and agents (hydrants, foam apparatus, sand) placed close to the pipeline joints. 5. Electrical equipment onboard is in good working order and in good repair; air lines of appropriate recognizable type. 6. No heaters are used; the exception are pump heaters and those used in the galley (to be placed in appropriate space). 7. Ship is adequately supplied with necessary anti sparking tools. 8. All spaces in the near vicinity of tank vents are closed and should have a continuous natural ventilation in all spaces liable to containing inflammable gas. 9. During loading/discharge operations qualified crew members keep watch on deck and the vessel's officer responsible for cargo handling operations and fire prevention is in the control room (pumping room). 10. There are appropriate ladders for safe boarding sufficiently lighted by night. 11. There are pilot ladders for safe boarding sufficiently lighted by night. 12. Loading arms are supported by wooden flooring. 13. There is compliance with the regulations forbidding smoking and open fires onboard. Port Operation Procedures: A ship shall be deemed to have entered the Port after it has dropped anchor at an anchorage, exhibited anchor signals or being safely berthed alongside. While the tanker is in the port, it shall carry sufficient number of deck and engine room crew member (of appropriate qualification and authorisation) to be determined by the Master, to ensure safe manoeuvering, shifting or salvage operation. Ship fire fighting appliances shall be fully operational and the ship ready to leave the berth and clear the port immediately. Tankers may stay in the port only during loading or discharging operations which should be conducted by appropriate terminal's facilities and while carrying out administrative formalities relating to departure, no more than 2 hours at no extra charge. Tankers staying in the port, conducting loading and discharge operations, are required to display, night and day, appropriate signals defined by the International Signal Code. A foreign flag ship may hoist a small or large code pennant in the port if so approved by the Harbour Master's Office. A ship may use the ship's whistle (siren) only on the basis of a previous approval obtained from the Harbour Master's Office, except in the case of emergency. No lowering of lifeboats, rescue boats, life rafts or other floating gear shall be allowed, either in the port or anchorage, without consent. Inert Gas: Cargo tanks shall be checked by the Concessionaire, Loading Master respectively, for the purpose of establishing oxygen content in the tanks. Before the cargo loading commences, all cargo tanks should be properly inerted so that oxygen content does not exceed 8% of the gas mixture volume. In case of a higher oxygen content, the ship will be required to vacate the berth and return to the anchorage to continue with inerting until the given values are attained. During tanker discharge operation, cargo tanks should be inerted to have an oxygen content below 8% and a constant positive pressure. If, because of the ship inert gas system not working properly, any of the tanks are found to have oxygen content in excess of 8%, the ship must immediately suspend the discharge operation and inform the Loading Master accordingly. No discharge operation shall take place until the failure of the inert gas system has been eliminated. No gas freeing, tank cleaning or deratting of the vessel should be carried out in the port.
Health regulations
Free pratique to be requested on arrival only. Ship Sanitation Control Exemption Certificate renewal is possible.
Notices of readiness
NOR is to be tendered between Mon-Thu 0800-1800hrs, Fri 0800-1400hrs.
β Terminals & Berths
9 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Dina Petrochemistry Terminal 45.20035, 14.5408 | Both | β | β | β | β |
OperatorDINA Petrokemija dd / Adria | |||||
| Multipurpose Quay 45.2030333, 14.54 | Both | β | 6 m | β | Closed |
Mooring SpecsFlat Side: 15 m Gangway: Shore (crew) Cargo HandlingBreakbulk OperatorDINA Petrokemija dd / Adria | |||||
| FSRU 'LNG Croatia 45.2007667, 14.53325 | Tanker | β | β | β | Active |
Mooring SpecsFlat Side: 220 m OperatorLNG Croatia LLC | |||||
| FSRU 'LNG Croatia' Terminal 45.2005833, 14.5335 | Tanker | β | β | β | β |
OperatorLNG Croatia LLC | |||||
| JANAF Oil Terminal 45.218, 14.5175333 | Tanker | β | β | β | β |
OperatorJadranski Naftovod Dd (JANAF) | |||||
| Jetty A (Chemical Berth) 45.2013, 14.5349333 | Tanker | β | 15 m | 60,000 T | Closed |
Mooring SpecsFlat Side: 36 m Side: Port Gangway: Shore (crew) OperatorDINA Petrokemija dd / Adria | |||||
| Jetty B (LPG Berth) 45.20285, 14.5376333 | Tanker | β | 11.5 m | 25,000 T | Closed |
Mooring SpecsFlat Side: 46 m Side: Port Gangway: Shore (crew) OperatorDINA Petrokemija dd / Adria | |||||
| No 01 45.2258833, 14.5335833 | Tanker | 333 m | 29 m | 299,999 T | Active |
Mooring SpecsFlat Side: 40 m Side: PORT Gangway: Shore (crew) OperatorJadranski Naftovod Dd (JANAF) | |||||
| No 02 45.2219167, 14.5366833 | Tanker | 280.5 m | 29 m | 165,293 T | Active |
Mooring SpecsFlat Side: 40 m Side: Port Gangway: Shore (crew) OperatorJadranski Naftovod Dd (JANAF) | |||||
π’ Registered Agencies & Contacts
5 contacts registered.
JADROAGENT RIJEKA
Port AgencyPIC: Mr. Nenad Matesic
Address: Trg Ivana Koblera 2 (POB 120) HR-51000 Rijeka, Croatia
Email: tramp@jadroagent.hr
Phone: +385 51212466
Jadroagent
Port AgencyPIC: Mr. Nenad Matesic
Address: Trg Ivana Koblera 2 (POB 120) HR-51000 Rijeka, Croatia
Email: tramp@jadroagent.hr
Phone: +385 992109802, +385 51212466
Liburnia Maritime Agency Ltd
Port AgencyPIC: Ana Milinkovic - Badovinac
Address: V.C. Emina 3 51410 Opatija, Croatia
Email: operations@liburniamar.hr
Phone: +385 989820928
Omisalj Port Authority
Port AuthorityAddress: Put mora 1, 51 513 Omisalj, Croatia
Tel: +385 51 842053
Fax: +385 51 842219
Email: li-omisalj@pomorstvo.hr
JANAF dd
Port OperatorAddress: Polje 2, 51 513 Omisalj, Croatia
Tel: +385 51 206200
Fax: +385 51 842273
Email: bruno.jankovic@janaf.hr