MySeaTime — Professional Sea‑Service Tracker

London (GBLON)

📍 51.5166 N, 0.1166 E 🕐 GMT 🌍 United Kingdom of Great Britain and Northern Ireland

Max Length355 m
Max Beam73 m
Max Draft14.5 m
Max DWT300,000 T
Density1025-1020
ISPS✓
ECA✓

📋 Port Overview

✓ ISPS✓ ECAFree Trade ZoneEcoPort
London is the UK’s busiest inland waterway, stretching approximately 150km from the North Sea up to Teddington Lock, in a combination of wet docks and riverside terminals. Cargo includes break bulk, liquid and dry bulks, containers, refrigerated cargo and new vehicles (Ro-Ro). The area also caters for project and heavy lift cargoes (used for the many property development sites in the City of London and along the banks of the river). The Port of London Authority (PLA) is a self-funding public Trust which governs the Port of London area and is based at Denton Wharf, Gravesend. There are 11 Dock Basins in the Port of London area. Throughout the 20th century the PLA owned and operated the majority of these docks and wharfs but they have now mostly been either closed or privatised. Today the PLA acts mainly as a managing authority for the tidal stretch of the River Thames, ensuring safe navigation, and the well-being of the port and its activities. Riverside berths can be found at Barking, Battersea, Canning Town, Canvey Island, Charlton, Cliffe, Coryton, Dagenham, Dartford, Erith, Fulham, Gravesend, Grays, Greenhithe, Greenwich, Northfleet, Purfleet, Silvertown, Stanford-le-Hope, Thurrock, Tilbury and Wandsworth. Major facilities are also located at the Port of Tilbury, operated by Forth Ports with the PLA managing the tidal waters on the N bank of the Thames, approx. 40km E of London Bridge. Tilbury has 56 operational berths, 31 independent operating terminals and a total of 10.2km of quayside including deepwater berths outside its locks. London Gateway, at Stanford-le-Hope, is a major container facility, also on the N bank of River Thames approx. 7.5nm NE of the Tilbury and operated by DP World, again with the PLA managing the tidal waters. Following expansion, the Terminal will shortly have six operational berths. Nov 2024, DP World launched the world's first all-electric berth at London Gateway. The fourth berth of the expansion project is able to service vessels with an all-electric fleet, setting a global standard in low-carbon shipping infrastructure. As of 2024, two further berths (No 5 & 6) are still under construction and once operational will be able to advance DP World's goal to be net-zero by 2050.

🚢 Cargo Capabilities

ContainerLiquidDry BulkBreakbulkMultipurposePassengerRoroGasLngLpg

Load line zone

North Atlantic Winter Seasonal Zone II, Winter Nov 1 to Mar 31, Summer Apr 1 to Oct 31.

Location

London is the capital and principal port of the United Kingdom, on the River Thames, situated in SE England.

Max size

LOA 355m, beam 73m, draught 14.5m, 300,000DWT.

Traffic figures

Approx 52,000,000t of cargo, 2,000,000TEUs, 6,000 vessels and 4,500,000 passengers are handled annually.

🔧 Facilities

Bunkering ✓Fresh Water ✓Stores ✓Repairs ✓

🏗️ Crane Capacity (TONS)

Up to 2425 – 4950 – 99100 – 149

Other ports in United Kingdom of Great Britain and Northern Ireland

See all United Kingdom of Great Britain and Northern Ireland ports