MySeaTime β€” Professional Sea‑Service Tracker

Lucina Terminal (GALUC)

πŸ“ -3.6666 N, 10.7666 E πŸ• GMT +1 🌍 Gabon

Max Length150 m
Max Beamβ€”
Max Draftβ€”
Max DWT140,000 T
Density1025
ISPSβœ—
ECAβœ—

πŸ“‹ Port Overview

βœ— ISPSβœ— ECA
Lucina is an offshore oil terminal with its production facilities that are located on a four pile platform in position 03Β°41.0'S 010Β°44.0'E. The terminal is no longer operational, FSU Banio having been broken up. The SBM positioned at 03Β°39.6'S 011Β°46.2'E remains.

🚒 Cargo Capabilities

Liquid

Load line zone

Tropical.

Location

Lucina Terminal is located approximately 20nm off the southern coast of Gabon.

Max size

The terminal can accommodate tankers up to 140,000SDWT and max displacement of 120,000t with a bow to manifold distance not exceeding 141m. Arrival trim must not exceed 2.4m. Largest vessel handled: "Oriental Majesty" 136,113DWT, draught 15.0m.

Traffic figures

Approx 6,000,000t of cargo handled by the port annually.

πŸ”§ Facilities

24/7 βœ“

Other ports in Gabon

See all Gabon ports