Lucina Terminal (GALUC)
π -3.6666 N, 10.7666 E π GMT +1 π Gabon
Max Length150 m
Max Beamβ
Max Draftβ
Max DWT140,000 T
Density1025
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
Lucina is an offshore oil terminal with its production facilities that are located on a four pile platform in position 03Β°41.0'S 010Β°44.0'E. The terminal is no longer operational, FSU Banio having been broken up. The SBM positioned at 03Β°39.6'S 011Β°46.2'E remains.
π’ Cargo Capabilities
Liquid
Load line zone
Tropical.
Location
Lucina Terminal is located approximately 20nm off the southern coast of Gabon.
Max size
The terminal can accommodate tankers up to 140,000SDWT and max displacement of 120,000t with a bow to manifold distance not exceeding 141m. Arrival trim must not exceed 2.4m. Largest vessel handled: "Oriental Majesty" 136,113DWT, draught 15.0m.
Traffic figures
Approx 6,000,000t of cargo handled by the port annually.
π§ Facilities
24/7 β
π‘οΈ Pre-Arrival Information
Communications
VHF: Ch 09 (calling and working). Callsign "Lucina Oil Terminal" or "Banio". A 24 hour service is maintained in French language and a watch in English language between 0600 and 1800hrs.
Documentation required
..... Document Copies 1. Crew List 4 2. Passenger List 2 3. Crew Tobacco, Spirits and Personal Effects List 3 4. Stores List 3 5. Arms and Ammunition List 2 6. Last Port of Call 1 7. Ports during last 3 months 3 8. Animals List 2 9. Narcotics List 2 10. Notice of Readiness 1
ETA
Vessels should send initial ETA to Perenco SA via email at least 7 days prior to arrival. ETA should be confirmed 72, 48, 24 and 12 hours in advance. State any special requirements and/or quantity to be loaded. Email address: rmered@gab.perenco.com.
General notices & regulations
..... 1. Engines must be available at all times. 2. Scuppers: to be closed and sealed prior to loading. 3. Tanks: tank lids must be closed and tanks inerted prior to loading. 4. Pyrophoric Ignition: vessels fitted with an inert gas system should neither start deballasting operations nor continue these operations in the event of an inert gas failure.
Notices of readiness
Notice of readiness will be accepted by the mooring master either: ..... 1. At vessel anchorage time if mooring is delayed at the request of the terminal, provided the vessel is within date range. 2. On completion of mooring if vessel is berthed on arrival. 3. On commencement of laydays if vessel berthed prior to commencement of laydays.
β Terminals & Berths
2 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Lucina Terminal -3.7569, 10.5278 | Tanker | β | β | β | β |
OperatorBW Offshore | |||||
| SBM -3.658333, 10.774333 | Tanker | β | 34 m | 140,000 T | Closed |
π’ Registered Agencies & Contacts
3 contacts registered.
Perenco Gabon SA
Port AuthorityAddress: BP 780, Port Gentil, Gabon
Tel: +241 758465
Fax: +241 550647
Email: baniogan64@eikmail.com
Perenco Gabon SA
Port OperatorAddress: BP 780, Port Gentil, Gabon
Tel: +241 550641
Fax: +241 550647
Email: baniogan64@eikmail.com