Calcite (USMI3)
π 45.4000 N, -83.7830 E π GMT -5 π United States of America
Max Lengthβ
Max Beamβ
Max Draftβ
Max DWTβ
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
The port has the biggest limestone quarry and the biggest limestone processing plant in the world.
π’ Cargo Capabilities
Dry Bulk
Location
The port is located on the shores of Lake Huron in northeast Michigan just over 2.5km southeast of Rogers City.
π§ Facilities
β Terminals & Berths
3 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Carmeuse Lime and Stone Terminal 45.41255, -83.78905 | Dry Cargo | β | β | β | β |
OperatorCarmeuse Lime and Stone | |||||
| North Berth 45.4112, -83.7860833 | Dry Cargo | β | β | β | Active |
Mooring SpecsFlat Side: 276 m Side: Port or Starboard OperatorCarmeuse Lime and Stone | |||||
| South Berth 45.4107833, -83.7857333 | Dry Cargo | β | β | β | Active |
Mooring SpecsFlat Side: 276 m Side: Port or Starboard OperatorCarmeuse Lime and Stone | |||||
π’ Registered Agencies & Contacts
1 contact registered.