Rabigh (SARAB)
📍 22.7333 N, 38.9833 E 🕐 GMT +3 🌍 Saudi Arabia
Max Length350 m
Max Beam55 m
Max Draft15 m
Max DWT325,000 T
Density1027.5
ISPS✓
ECA✗
📋 Port Overview
✓ ISPS✗ ECA
Rabigh is a deep water port protected by an offshore barrier reef running parallel to the coast. It consists of the Oil Cargo Port and 400,000bbl/day Refinery, Pioneer Port, Dry Cargo Port and Dry Cargo Pier.
🚢 Cargo Capabilities
LiquidDry BulkBreakbulkRoroGasLpg
Location
The commercial port of Rabigh is situated on the E coast of the Red Sea in Saudi Arabia, about 66nm N of Jeddah Islamic Seaport.
Max size
LOA 400m, draught 23.5m, 325,000DWT
🔧 Facilities
Bunkering ✓Fresh Water ✗Repairs ✗24/7 ✓Crew Change ✓
🏗️ Crane Capacity (TONS)
Up to 24
📍 Pilot Requirements
Body
RBIGH 22°44.32'N 38°59.51'E UNCTAD LOCODE: SA RAB ________________________________________________________________________________ ___________
Body2
{
"widget_1_pilotage": {
"area_groups": [
{
"area_name": null,
"pilots_area_description": null,
"pilots_contact_details": [
{
"station_call_name": "Terminal Pilots",
"vhf_primary_watch": null,
"vhf_secondary_working": null,
"telephones": [
"+966(0)12 4254505",
"+966(0)12 4254507"
],
"faxes": [
"+966(0)12 4254502"
],
"emails": [],
"websites": [],
"operating_hours": "H24"
}
],
"procedure": {
"compulsory_text_note": "Pilotage is compulsory for all vessels entering and leaving the port.",
"when_to_report": null,
"how_to_report": null,
"what_to_report": [],
"pilot_boarding_positions": [
{
"designator": null,
"coordinates_or_verbose": "22°44.59'N 38°53.75'E (2 n miles W of buoy No 15)",
"vessel_particular_constraints": "Vessels should not proceed E of this position without a Pilot."
}
],
"leftover_text_notes": []
}
},
{
"area_name": null,
"pilots_area_description": null,
"pilots_contact_details": [
{
"station_call_name": "R\\bigh Port Control",
"vhf_primary_watch": "Ch 16",
"vhf_secondary_working": "01 03 09 15 16 18A 19A 65A 66A 78A 79A",
"telephones": [
"+966(0)12 4223200"
],
"faxes": [
"+966(0)12 4221794",
"+966(0)12 4223136"
],
"emails": [
"rab-telex@aramco.com"
],
"websites": [],
"operating_hours": "H24"
}
],
"procedure": {
"compulsory_text_note": null,
"when_to_report": null,
"how_to_report": null,
"what_to_report": [],
"pilot_boarding_positions": [],
"leftover_text_notes": [
"For details of the port entry regulations see Admiralty Sailing Directions (NP64).",
"Notice of ETA: Vessels bound for the terminal should send initial ETA as soon as orders are received to proceed to the terminal.",
"ETA should be confirmed 72h, 48h and 24h prior to arrival.",
"All ETA and related messages should be sent to the terminal via e-mail.",
"Terminal is operated by Saudi Aramco."
]
}
}
]
},
"widget_2_vts": {
"cross_reference_redirect": null,
"area_groups": [
{
"area_name": null,
"vts_boundaries": {
"description": null,
"coordinates": []
},
"contact_details": [
{
"station_call_name": "R\\bigh Port Control",
"vhf_primary_watch": "Ch 16",
"vhf_secondary_working": "01 03 09 15 16 18A 19A 65A 66A 78A 79A",
"telephones": [
"+966(0)12 4223200"
],
"faxes": [
"+966(0)12 4221794",
"+966(0)12 4223136"
],
"emails": [
"rab-telex@aramco.com"
],
"websites": [],
"operating_hours": "H24"
}
],
"procedure": {
"compulsory_text_note": null,
"general_rules": []
},
"reporting_lines_and_points": [],
"reporting_requirements": []
}
]
},
"widget_3_tugs": {
"contact_details": [
{
"provider_name": null,
"vhf_channels": [],
"telephones": [],
"emails": []
}
],
"availability_hours": null,
"notes": []
},
"widget_4_port_and_notes": {
"port_and_terminal_contacts": [
{
"station_call_name": "Terminal",
"vhf_primary_watch": null,
"vhf_secondary_working": null,
"telephones": [],
"faxes": [],
"emails": [],
"websites": [],
"operating_hours": "H24"
},
{
"station_call_name": "Port Control",
"vhf_primary_watch": "Ch 16",
"vhf_secondary_working": "01 03 09 15 16 18A 19A 65A 66A 78A 79A",
"telephones": [
"+966(0)12 4223200"
],
"faxes": [
"+966(0)12 4221794",
"+966(0)12 4223136"
],
"emails": [
"rab-telex@aramco.com"
],
"websites": [],
"operating_hours": "H24"
}
],
"standalone_general_notes": [
"Terminal is operated by Saudi Aramco.",
"For details of the port entry regulations see Admiralty Sailing Directions (NP64).",
"Notice of ETA: Vessels bound for the terminal should send initial ETA as soon as orders are received to proceed to the terminal.",
"ETA should be confirmed 72h, 48h and 24h prior to arrival.",
"All ETA and related messages should be sent to the terminal via e-mail."
]
},
"formatted_text_original": "PILOTS CONTACT DETAILS: Terminal Pilots Telephone: +966(0)12 4254505 +966(0)12 4254507 Fax: +966(0)12 4254502 HOURS:\tH24 PROCEDURE: (1) Pilotage is compulsory for all vessels entering and leaving the port. (2) Pilot boards in position 22°44.59ґN 38°53.75ґE (2 n miles W of buoy No 15). Vessels should not proceed E of this position without a Pilot. ________________________________________________________________________________ ___________ TERMINAL CONTACT DETAILS: Port Control Call: R\\bigh Port Control VHF Frequency: Ch 16 66A; 01 03 09 15 16 18A 19A 65A 66A 78A 79A Terminal Telephone: +966(0)12 4223200 Fax: +966(0)12 4221794 \t+966(0)12 4223136 E-mail: rab-telex@aramco.com HOURS:\tH24 PROCEDURE: (1) For details of the port entry regulations see Admiralty Sailing Directions (NP64). (2) Notice of ETA: Vessels bound for the terminal should send initial ETA as soon as orders are received to proceed to the terminal. (3) ETA should be confirmed 72h, 48h and 24h prior to arrival. (4) All ETA and related messages should be sent to the terminal via e-mail. NOTE: Terminal is operated by Saudi Aramco. ________________________________________________________________________________ ___________"
}
🛡️ Pre-Arrival Information
Communications
Radio: VHF: All marine services and shipping movements within the port area are monitored and controlled by Rabigh port control which maintains VHF watch on Ch 16 and 66A. Vessels should finally confirm their ETA and other particulars at least 3 hours before arrival. The following VHF Channels are continuously available for use by Rabigh Port Control: Ch 16, 01, 03, 15, 18A, 19A, 65A, 66A, 78A, 79A. In the event of an emergency Port Control will designate a channel for use during the period of emergency. Health: Quarantine: A doctor will board the vessel on arrival at the berth in order to expedite quarantine clearance. International Certificates of Vaccination against cholera, smallpox and yellow fever must be made available, if required in accordance with international or local health regulations.
Customs and Immigration
Customs may board the vessel at the berth or anchorage. All alcoholic beverages must be placed under seal. Cigarettes, cigars and tobacco in excess of normal consumption during the expected duration of stay are to be placed under seal. Spirits are strictly prohibited.
Documentation required
Documentation: The Rules and Regulations for Saudi Arabian Seaports specify that masters must present or make available the following papers and documents: ..... 1. Log Book 2. Registration Certificate 3. Classification Certificate 4. Load Line Certificate 5. Safety Construction Certificate 6. Safety Equipment Certificate 7. Radio and Wireless Certificate 8. Cargo Gear Certificate 9. Marine Health Certificate 10. Vaccination List 11. Ship Sanitation Control Certificate 12. Clearance from Last Port of Call 13. Israel Boycott declaration 14. Ship's Stores List 15. Grain Shipping Certificate if the vessel is carrying a grain shipment 16. Mail Transport documents in accordance with the International Postal Treaty if any mail is carried aboard 17. Five copies of the Crew List including name, nationality, date of birth, passport number, port of embarkation, port of disembarkation 18. Two copies of Personal Effects of Crew and Passengers. In addition, the Rules and Regulations require that the Oil Record Book and Certificate of Fitness (in cases of gas and chemical carriers) are available for inspection. To obtain port clearance the master of the vessel shall present or make available for inspection the following papers and documents or copies of them to Port Management: ..... 1. Log Book 2. Registration Certificate 3. Load Line Certificate 4. Safety Construction Certificate 5. Safety Equipment Certificate 6. Port Stevedore out-turn report 7. Radio and Wireless Certificate 8. Receipt for payment of Customs Duties 9. Shipping Note and Cargo Manifest for any cargo loaded. Full details regarding procedures and conduct of vessel and crew must be checked with Rules and Regulations of Saudi Arabian Seaports.
ETA
The Saudi Arabian Ports Management require pre-loading advice on arrival at the first port of loading and a further notice of ETA with updated particulars of the cargo on sailing from the final loading port. Vessel's ETA to be sent 5 days, 48 and 24 hours prior to arrival at the port. ETA should be confirmed at least 3 hours prior to arrival. Vessels in ballast bound for loading at Rabigh should follow the same ETA procedures. Dry Cargo Vessels: The vessel must send the following information to: ..... 1. Saudi Aramco Rabigh, 2. Rabigh Port Management 3. Rabigh Port Authority 4. Rabigh Pilots, Fax: +966 2 4252 432, and 5. Vessel's agent. Information Required: 1. Radio callsign 2. Vessel's name 3. Owner/Liners 4. Nationality 5. Agent 6. Length overall (m) 7. Maximum draught (m) 8. Number of hatches 9. GT 10. NT 11. DWT 12. Previous name if any 13. Type of vessel 14. Type of cargo 15. Total cargo weight (tons) 16. Total cargo freight (tons) 17. Number of containers/TEUs (where applicable) 18. Number of livestock (where applicable) 19. ETA 20. Actual arrival draught 21. Hazardous cargo for Rabigh 22. Hazardous cargo in transit for other ports 23. Tonnage to hatch for Rabigh discharge 24. Year of construction 25. Lloyd's Register number 26. All ports of loading 27. Number, position and SWL of derricks and/or cranes and particulars and positions of ramps 28. All ports at which cargo will have been loaded for discharge at Rabigh 29. All other ports at which the vessel will have called between arrival at the first port of loading and arrival at Rabigh 30. All ports at which cargo remaining onboard will be discharged after completion of discharge at Rabigh 31. Last 3 ports visited before arrival, in order 32. Economic speed 33. Total volume of vessel in tons 34. Cubic volume of hatches 35. Reason for visit 36. Estimated time and date of departure 37. Ammunition and/or explosives in transit to Rabigh 38. Cargo of alcoholic beverages in transit to Rabigh 39. Arms and ammunition onboard for self defence 40. Information relating to ship's radars (type of radar, frequency, scan speed, pulse width, pulse peak power, pulse repetition, beam width). The vessel's name and callsign should be given in every subsequent telex for computer reference. The absence of any of the above information may incur delay to the vessel. Questions not applicable to a particular vessel should be indicated as such. Tankers: As soon as a vessel receives orders to proceed to the port, the following information must be sent to: ..... 1. Saudi Aramco Rabigh Refinery 2. Rabigh Port Management 3. Rabigh Port Authority 4. Rabigh Pilots, Fax: +966 2 4252 432 5. Vessels agent. Information Required: 1. Name of vessel 2. Former names 3. Port of registry, flag, callsign 4. LOA, GT, NT 5. Summer DWT, arrival DWT 6. Draught on arrival forward and aft 7. ETA 8. Last port 9. Cargo onboard, flash point, destination of cargo 10. Cargo requirements 11. Previous cargo and quantity of residues onboard for load on top 12. IMO class 13. Whether gas free or in inert condition 14. Port of loading ballast and amount 15. Quantity of ballast loaded on passage 16. Quantity of segregated ballast on arrival 17. Quantity of cargo tank ballast on arrival 18. Time for deballasting; can ship load/deballast simultaneously? 19. Special conditions, difficulties, defective equipment or gear which could present special hazards or difficulties when mooring, unmooring or during cargo operations 20. Agent's name 21. Maximum loading rate 22. Topping off rate 23. Bunker requirements 24. Cargo manifold 25. Bunker connection size 26. Derricks 27. Arms and ammunition onboard for self defence 28. Information relating to ship's radars (type of radar, frequency, scan speed, pulse width, pulse peak power, pulse repetition, beam width) 29. Owners 30. Operators 31. Charterers 32. Year built 33. Stowaways 34. Alcoholic beverages as cargo onboard 35. Prohibited articles if any to be collected and placed in bonded stores prior to vessel's arrival 36. P&I Club 37. Master's name. Gas Tankers: As soon as a vessel receives orders to proceed to the port, the following information must be sent to : 1. Saudi Aramco Rabigh Refinery 2. Rabigh Port Management 3. Rabigh Port Authority 4. Vessel's agent. Information Required: 1. Name of vessel indicating any former names 2. Port of registry, flag, callsign 3. LOA, GT, NT 4. Summer DWT, arrival DWT, arrival draughts forward and aft 5. Last port, ETA Rabigh 6. Quantity of ballast on arrival, where loaded 7. Quantity of dirty ballast on arrival 8. Total cargo capacity in mі, cargo required 9. Grades and quantities of any part cargoes or cargo residues and where loaded, grade and quantities of product in deck tanks 10. Are part cargoes to be commingled with loadings 11. Gauge pressures top, bottom and mean temperatures of each cargo tank 12. Quantity of coolant required in addition to cargo requirements 13. Maximum allowable relief valve settings for all cargo tanks 14. Have any cargoes other than LPG been carried during last three loaded voyages. Specify 15. Maximum oxygen content by volume per cent of each warm or inerted cargo tank 16. If tank purging required, specify whether: a. parallel or in series b. liquid from shore direct to cargo tanks c. liquid from shore to vessel's vaporisers, specify vaporiser throughput in RLPG/hr. 17. If cooling down tanks is required, specify maximum cooling rate in terms of temperature reduction per hour and maximum temperature differential permitted between any two points in cargo tanks 18. Available total capacity of ship's reliquefaction plant for each nominated cargo product 19. Type of ship's reliquefaction system, ie direct, cascade or other 20. Capacity of ship's gas blowers to shore vapour return line in volume per hour at reference temperature 21. Maximum loading rate and approximate topping off rate 22. Bunker manifold size, bunker requirements 23. Manifold presentation, function, ASA rating, size, from forward 24. Agent's name 25. IMO ship type, does vessel have a certificate of fitness 26. Special conditions, difficulties, defective equipment or gear which could present special hazards or difficulties when mooring, unmooring or during cargo operations 27. Arms and ammunition onboard for the purpose of self defence 28. Information relating to ship's radars (type of radar, frequency, scan speed, pulse width, pulse peak power, pulse repetition frequency, beam width).
Flags
Saudi flag to be flown on foremast throughout 24 hours whilst within port limits.
General notices & regulations
Full details regarding port rules and regulations are contained in "Rules and Regulations for Saudi Arabian Ports". This book must be obtained on first arriving in a Saudi Arabian port and be kept onboard. All vessels calling at Rabigh must comply with the international requirements concerning the reliable condition of the vessel's engines, equipment, etc and have onboard qualified officers and efficient crew. No vessel shall be allowed to navigate within the port unless it complies with the following equipment requirements: ..... 1. Efficient VHF radio telephone capable of working the port frequencies. 2. Efficient steering gear with fully operational rudder and helm indicators. 3. Efficient propulsion both ahead and astern and fully operational tachometer. 4. Both anchors capable of being released and raised by the vessel 5. Efficient winches and adequate mooring gear to secure vessel safely; an efficient mooring stations communication systems. 6. Sufficient crew onboard at all times to operate the vessel safely and efficiently with all officers properly qualified and certificated as required by the flag nation, Saudi Rules and Regulations. 7. All secondary power or mechanical systems on the vessel to be in operation and immediately available in the event of failure of any primary system. If any vessel cannot comply with any of the requirements listed above, Rabigh Port Management Control must be advised prior to arrival or departure. The vessel will then be subject to inspection and possible delay. Failure to comply or to notify Rabigh Port Management Control may result in the vessel being fined or refused entry/departure to or from the port or both. Vessels will be accepted for berthing and unberthing only if they are effectively ballasted. Vessels calling at Rabigh for loading products should carry onboard a minimum quantity of ballast equivalent to 30% of summer deadweight. Further quantities may be required in case of weather deterioration as instructed by Port Control. The Master will be responsible for complying fully with the requirements of Saudi Arabian government departments, ministries, agencies and organisations. Particular attention should be paid to the requirements of customs, coastguard, immigration and port health authorities. Masters requiring any advice on these requirements should contact their local agent. Prohibitions: ..... 1. No photographs shall be taken in the port; 2. Radio station will be sealed and not used during loading/discharging operations; 3. The importation of the following items is strictly prohibited: a. Explosives and firearms including air rifles; b. Implements of war of any kind including antiques; c. Alcoholic beverages, religious matters not pertaining to the Moslem faith, pig meat and products; d. Playing cards and gambling games or devices, narcotics and pornographic photographs or magazines carrying such pictures.
Notices of readiness
Master can tender Notice of Readiness on arrival at Pilot Station or at anchorage or depending on charterers instruction.
⚓ Terminals & Berths
17 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Concrete Finger Piers 22.7347833, 38.9936167 | Dry Cargo | 268.8 m | 15 m | — | Active |
Mooring SpecsSide: Port OperatorRabigh Port | |||||
| Dry Cargo Dock 22.7350167, 38.9891333 | Dry Cargo | — | 9.1 m | — | Active |
Mooring SpecsFlat Side: 70 m Cargo HandlingBreakbulk OperatorRabigh Port | |||||
| Dry Cargo Port 22.74775, 39.0128667 | Dry Cargo | — | — | — | — |
OperatorRabigh Port | |||||
| Pioneer Port 22.7337667, 38.9950333 | Dry Cargo | — | — | — | — |
OperatorRabigh Port | |||||
| Small Craft Wharf 22.7474167, 39.0069333 | Dry Cargo | — | 12 m | — | Never Existed |
| West Jetty 22.7357167, 38.9916333 | Dry Cargo | 155 m | 10 m | — | Active |
Mooring SpecsFlat Side: 190 m Side: Port OperatorRabigh Port | |||||
| New Tanker Berth 22.736, 38.9996 | Tanker | 185.06 m | — | 55,634 T | Active |
Mooring SpecsFlat Side: 56 m Side: Port OperatorSaudi Aramco & Sumitomo Chemical Co Ltd. | |||||
| No 02 22.738333, 39.0065 | Tanker | 333.27 m | 26 m | 318,440 T | Active |
Mooring SpecsFlat Side: 50 m Side: Starboard Gangway: Shore (crew) OperatorSAUDI ARAMCO | |||||
| No 03 22.741666, 39.003833 | Tanker | 329.99 m | 26 m | 300,323 T | Active |
Mooring SpecsFlat Side: 54 m Side: Starboard Gangway: Shore (crew) OperatorSAUDI ARAMCO | |||||
| No 05 22.73385, 39.0013 | Tanker | 184.9 m | — | 55,202 T | Active |
Mooring SpecsFlat Side: 45 m Side: Port Gangway: Ship OperatorSaudi Aramco & Sumitomo Chemical Co Ltd. | |||||
| Power Station Oil Berth 22.6552833, 39.02625 | Tanker | 250 m | — | 115,577 T | Active |
Mooring SpecsFlat Side: 105 m Side: Starboard OperatorRabigh Arabian Water and Electricity Company (RAWEC) | |||||
| Rabigh Electricity Company (RABEC) Berth 22.6480333, 39.0274 | Tanker | 250.17 m | — | — | Active |
Mooring SpecsFlat Side: 40 m OperatorRabigh Electricity Company (RABEC) | |||||
| Rabigh Electricity Company, RABEC 22.6532667, 39.03575 | Tanker | — | — | — | — |
OperatorRabigh Electricity Company (RABEC) | |||||
| Rabigh Power Plant 2 22.6611833, 39.0320833 | Tanker | — | — | — | — |
OperatorSaudi Electric Company (SEC) | |||||
| Rabigh Power Plant 2 Berth 22.6602667, 39.0266667 | Tanker | 250.07 m | — | — | Active |
Mooring SpecsFlat Side: 42 m OperatorSaudi Electric Company (SEC) | |||||
| Rabigh Power Station Oil Terminal 22.6575667, 39.0322833 | Tanker | — | — | — | — |
OperatorRabigh Arabian Water and Electricity Company (RAWEC) | |||||
| Rabigh refinery - Liquid cargo port 22.7200167, 39.0096333 | Tanker | — | — | — | — |
OperatorSAUDI ARAMCO | |||||
🏢 Registered Agencies & Contacts
4 contacts registered.
Sharaf Shipping Agency
Port AgencyPIC: Imam Ali
Address: PO Box 8976 Dammam 31492, Kingdom of Saudi Arabia
HASCO Shipping Agencies A Division of HASCO Group - Jeddah - Saudi Arabia
Port AgencyPIC: Ibrahim Mahir
Address: Prince Mohamed Ibn Abdulaziz Street
Email: ibrahim.mahir@hasco.com.sa
Phone: +966 35902144
Saudi Arabian American -Jeddah
Port OperatorAddress: PO Box 1604, Saudi Aramco Indust Complex, Port Area, Jeddah 21441, Saudi Arabia
Tel: +966 2 638 3641
Fax: +966 2 638 5347
Saudi Aramco Rabigh Refinery
Port AuthorityAddress: PO Box 177, Rabigh 21911, Saudi Arabia
Tel: +966 2 425 2381
Fax: +966 2 425 2732