Varandey (RUVAR)
π 68.7833 N, 57.9833 E π GMT +5 π Russian Federation
Max Length258 m
Max Beamβ
Max Draft14 m
Max DWTβ
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
The Lukoil's Varandey deep-water terminal has been operational since June 2008. The loading facility is approx 12nm off the Port of Varandey and is connected to onshore oil reservoirs by an underwater pipeline, through which oil is pumped.
π’ Cargo Capabilities
Liquid
Load line zone
North Atlantic Winter.
Location
Varandey is an oil export terminal located on the Barents Sea N coast of Russia.
Max size
Offshore: LOA 257.29m,draught 14.1m, 72,722DWT.
Traffic figures
Approximately 5,000,000t of crude oil are handled annually.
π§ Facilities
β Terminals & Berths
2 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| FOIROT Berth 69.0553, 58.1542333 | Tanker | 257.29 m | 14.1 m | 72,722 T | Active |
Mooring SpecsSide: Bow OperatorLukoil | |||||
| Lukoil Terminal 68.8482833, 58.24345 | Tanker | β | β | β | β |
OperatorLukoil | |||||
π’ Registered Agencies & Contacts
2 contacts registered.
Lukoil
Port AuthorityAddress: Bolshaya Ordynka, 1, 115035, Moscow, Russia
Tel: +78185322411
Email: priemnayavt@lukoil.com
Website: https://trans.lukoil.ru
Lukoil
Port OperatorAddress: Bolshaya Ordynka, 1, 115035, Moscow, Russia
Tel: +78185322411
Email: priemnayavt@lukoil.com
Website: https://trans.lukoil.ru/