Kikeh Marine Terminal (MYKIK)
π 5.8666 N, 114.2833 E π GMT +8 π Malaysia
Max Lengthβ
Max Beamβ
Max Draft100 m
Max DWT350,000 T
Density1025
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
FPSO βKikehβ is a converted ocean going tanker, in approx 1,300m water depth. The Kikeh SPAR production platform is located approx 1.6km from the FPSO. Export vessels moor in tandem to the stern of the FPSO.
π’ Cargo Capabilities
Liquid
Location
FPSO βKikehβ is located 120km NW of Labuan Island, offshore Sabah, East Malaysia.
Max size
Offshore: LOA 328.58m, BCM 54.51m, 273,409DWT.
π§ Facilities
Bunkering βFresh Water βStores βRepairs βCrew Change β
π Pilot Requirements
Body
KIKEH MARINE TERMINAL 5Β°52.53'N 114Β°17.59'E ________________________________________________________________________________ ___________
Body2
{
"widget_1_pilotage": {
"area_groups": [
{
"area_name": null,
"pilots_area_description": null,
"pilots_contact_details": [
{
"station_call_name": "Kikeh Marine Terminal",
"vhf_primary_watch": "16",
"vhf_secondary_working": "72",
"telephones": [],
"faxes": [],
"emails": [
"mooring.fpsokikeh@mdpc.com.my"
],
"websites": [],
"operating_hours": "H24"
}
],
"procedure": {
"compulsory_text_note": "Pilotage is compulsory.",
"when_to_report": null,
"how_to_report": null,
"what_to_report": [],
"pilot_boarding_positions": [
{
"designator": "Position 5Β°56.00'N 114Β°18.00'E",
"coordinates_or_verbose": "3 n miles N of the FPSO",
"vessel_particular_constraints": null
}
],
"pilot_disembarkation_positions": [],
"leftover_text_notes": [
"Notice of ETA: Vessels should advise ETA 72h, 48h, 24h and 12h before arrival.",
"Vessels departing from a port less than 72h distant should advise ETA on departure."
]
}
}
]
},
"widget_2_vts": {
"cross_reference_redirect": null,
"area_groups": [
{
"area_name": null,
"vts_boundaries": {
"description": null,
"coordinates": []
},
"contact_details": [
{
"station_call_name": "Kikeh Marine Terminal",
"vhf_primary_watch": "16",
"vhf_secondary_working": "72",
"telephones": [],
"faxes": [],
"emails": [
"mooring.fpsokikeh@mdpc.com.my"
],
"websites": [],
"operating_hours": "H24"
}
],
"procedure": {
"compulsory_text_note": null,
"general_rules": []
},
"reporting_lines_and_points": [],
"reporting_requirements": []
}
]
},
"widget_3_tugs": {
"contact_details": [],
"availability_hours": null,
"notes": []
},
"widget_4_port_and_notes": {
"port_and_terminal_contacts": [
{
"station_call_name": "Kikeh Marine Terminal",
"vhf_primary_watch": "16",
"vhf_secondary_working": "72",
"telephones": [],
"faxes": [],
"emails": [
"mooring.fpsokikeh@mdpc.com.my"
],
"websites": [],
"operating_hours": "H24"
}
],
"standalone_general_notes": [
"Terminal is operated by Malaysia Deepwater Production Contractor Sdn Bhd (MDPC)."
]
},
"formatted_text_original": "PILOTS HOURS:\tH24 PROCEDURE: (1) Pilotage is compulsory. (2) Pilot boards in position 5Β°56.00Β΄N 114Β°18.00Β΄E (3 n miles N of the FPSO). ________________________________________________________________________________ ___________\n TERMINAL CONTACT DETAILS: Call: Kikeh Marine Terminal VHF Frequency: Ch 16; 72 E-mail: mooring.fpsokikeh@mdpc.com.my HOURS:\tH24 PROCEDURE: Notice of ETA: Vessels should advise ETA 72h, 48h, 24h and 12h before arrival. \nVessels departing from a port less than 72h distant should advise ETA on departure. \nNOTE: Terminal is operated by Malaysia Deepwater Production Contractor Sdn Bhd (MDPC). ________________________________________________________________________________ ___________"
}
π‘οΈ Pre-Arrival Information
Communications
The Terminal maintains a 24 hour listening watch on VHF Ch 16. Export tanker operations will be conducted on VHF Ch 72. Export Tankers should establish contact with the terminal as soon as possible before arrival and not less than 3 hours before arrival. Once contact has been established on Ch 16, the terminal will use VHF Ch 72 for further communications. The Mooring Master and Assistant Mooring Master will be provided by the terminal with intrinsically safe hand held VHF radios for use onboard the Export Tanker. In the event of loss of communications, both the terminal and the Export tanker should revert to VHF Ch 16 to re-establish communications. VHF: Terminal: Ch 16 and 72. Inmarsat Mini-M (Alternate System), Tel: +873 7611 21796. Inmarsat "F77", Tel: +870 7611 21783; Fax: +870 7611 21784. FPSO Control Room, Tel: +603 7490 7394. FPSO Radio Room, Tel: +603 7490 7399. Email: SB_SrProdSupt@murphyoilcorp.com; Mooring.fpsokikeh@mdpc.com.my.
Customs and Immigration
Customs, Immigration and Health inspections will usually be carried out by two Customs Officers and one Immigration Officer. The Export Tanker is subject to clearance by Malaysian Customs, Health and other relevant authorities.
Documentation required
The following documents are required and must be prepared prior to arrival in order to achieve a speedy clearance. ..... 1. General Declaration. 2. Cargo Declaration. 3. Crew List. 4. Crews' Personal Effects List. 5. Crews' Foreign Currency List 6. Ships Stores Declaration and list of goods in bond 7. List of arms onboard or statement that none are onboard. 8. List of narcotics and narcotic containing drugs. 9. Safety Management Certificate 10. Document of Compliance Other documentation and information may be required of Export Tankers. Any such further requirements, which the terminal is aware of, will be related to the Export Tanker prior to or upon arrival.
ETA
The Master of the Export Tanker should notify the terminal of the ETA, at least 72 hours before arrival and again at 48, 24 and 12 hours. If the Export Tanker departs from its previous port of call less than 72 hours before its ETA, then the Master of the Export Tanker shall notify the terminal of the Export Tanker's ETA upon departure from such port. In any event the Master of the Export Tanker shall advise the ETA to the terminal 24 hours before arrival and thereafter any variation of more than 1 hour. The Master shall promptly notify the terminal of any significant change to a previously notified ETA.
Flags
As a courtesy, all Export Tankers should fly the national flag of Malaysia from arrival until departure of the vicinity of the Terminal. Signals to be displayed on arrival and when moored to the terminal: Arriving Export Tankers are required to display the following signals: ..... 1. Arriving Export Tankers are required to display the following signals: By day: International code flag 'Q' (For quarantine clearance). By night: Red light over white (For quarantine clearance). 2. While connected to the terminal, Export Tankers must display: By day: International code flag 'B'. By night: Red light.
General notices & regulations
The terminal operates 24 hours per day, all year round but because the terminal is an open and unsheltered mooring, there may be times when mooring operations will be inadvisable. Under these circumstances, the terminal will be closed until conditions improve. However, berthing operations will be restricted to daylight hours only.
Health regulations
To comply with the Malaysian Government health requirements, a radio pratique message should reach the Offtake vessel's agent not more than 24 hours, but no less than 12 hours before arrival, as per the instruction message. The Offtake vessel Master should sign and date the message. One Health/Quarantine Officer may be required to be on board the Export Tanker.
Notices of readiness
The Mooring Master, acting on behalf of the Company, will sign acknowledgement of the Export Tanker Notice of Readiness (NOR). NOR will be accepted when Pilot/Mooring Master boards the Offtake Vessel. NOR will not be accepted unless the Export Tanker complies with all provisions of the Terminal Handbook.
Standard messages
A standard message, requesting the following information will be sent to the Export Tanker at least 72 hours before arrival: ..... 1. Master's Name. 2. Nationality of Master and Crew. 3. Vessels flag/call sign/Inmarsat numbers (tel/tlx/fax). 4. Summer DWT/LOA/Beam/Draught/Freeboard and distance bow to centre of manifold (BCM). 5. Arrival draught (note: vessels must comply with - minimum 30% DWT - trim not to exceed 1% of LBP - propeller to be fully immersed). The propeller and the rudder shall be fully submerged at all times while berthed at the facility. Please note that in the event of arrival with excessive trim or too light a draught, berthing may be refused. 6. Previous name(s) of vessel and date of building. 7. Last port of call/next destination/voyage number on leaving. 8. Is your vessel single or double hull. 9. Quantity of cargo tank and segregated ballast onboard on arrival/time to discharge ballast. 10. Grade of previous 3 cargoes. 11. Confirm vessel can load and deballast concurrently (note: vessel must maintain a minimum of 30% DWT onboard at all times). 12. Advise cargo quantity required in bbls. 13. Advise your loading rate in bbls through 2 x 16in hoses during (a) deballasting and (b) normal loading. 14. Confirm vessel in good operational order: a) All tanks inerted and less than 8% oxygen. b) No defects in manoeuvring capability. c) All navigational equipment operational. d) Heating coils (if fitted) and tank valves not leaking. e) Windlass/winches and crane in good working order. f) 16in ANSI flange on port side cargo manifold. g) Pilot boarding arrangement complies with statutory regulations and in good condition. 15. Advise SWL of port side hose handling crane. 16. Confirm vessel complies with OCIMF recommendations for oil tanker manifolds and associated equipment (including for use at single point mooring). 17. Confirm bow chain stopper is suitable for 76mm chain. 18. What is your vessel experience factor? (Calculated as follows: Total of ships figures for last 10 voyages divided by Total of Berthing/Loading quantities for the same voyages). 19. SCAC Code (for cargo intended for USA). 20. Name of appointed agent. 21. Any conditions of Class. 22. Please confirm ISPS certification - i.e. valid ISSC (International Ship Security Certificate). 23. In line with ISPS requirements - your last 10 ports of call. 24. Your ETA at Kikeh Terminal as advised above. 25. Certified Officers must man the cargo control room at all times. 26. Reliable communications shall be maintained between the bridge, Kikeh Control Room and static tow boat. An hourly radio check on VHF Ch 16 is required between these stations. 27. The cargo and deballasting plan shall be presented after the berthing. A time shall be confirmed for the commencement of deballast operations. 28. Please arrange to have accommodation and meals for 8 personnel. Please note that due to shift work, the Mooring Master is to be given priority for single berth accommodation. 29. One winch barrel on the forecastle, with a direct lead to the chain stopper, should be empty ready to take a 24mm x 200m messenger and then a 72mm x 150m line. Please confirm that the barrel to be used can accommodate this. 30. The port side derrick or crane hook shall be required (minimum SWL 15 tons) and shall be fitted with an appropriate safety hook and a 2 metre extension stinger with safety latch hook. 31. The Facility maintains a 24-hour listening watch on VHF Ch 16. 32. The Facility keeps time on UTC + 8 hours. 33. For Pilot boarding, please have oilfield personnel basket rigged to the port crane. Ensure crane is fitted with safety latch hook and safety strop from crane runner to basket lifting hook. Alternatively and with prior agreement of Mooring Master please have a combination pilot ladder rigged on the Port side, approximately 6.0m above the water line. The ladder should be in accordance with IMO Resolution A.667(16). Please ensure manropes are provided. The use of "tripping" lines attached to the bottom of the pilot ladder are not to be deployed. The pilot shall board vessel via the line handling boat, the pilot boarding platform above the WL. Once the shuttle crew have boarded, the combination ladder shall be raised to deck level. Please arrange to have the gangway higher than normal to compensate for higher boarding height by personnel. 34. Your Chief Officer shall be required to accompany the Mooring Master on an inspection of your vessel prior to and after berthing operations, before completing the Off take Vessel Safety Checklist. 35. Please have the test certificate for the chain stopper ready for the Pilot's inspection. 36. A tanker assist towing vessel shall be in attendance during the time your vessel is moored astern of the Facility. The vessel shall be moored to you by means of a dedicated tow line secured to your stern. The tow rig shall be supplied by the tow vessel. The vessel shall be used in static tow mode when tandem moored to the Kikeh Marine Terminal. During the static tow your vessel's engines are to be on standby ready for immediate use. The tow line shall be connected to your vessel prior to mooring at the Kikeh Marine Terminal and shall be disconnected after you have been unmoored. Fire wires shall be rigged, one on the port quarter and one on the starboard shoulder. 37. The parcel size in bbls, intention to load in bbls. Approx loading time. 38. The Master to confirm that any ballast water intended to be discharged has been changed, but no later than 72 hours from arrival. The Export Tanker Master is requested to respond to this message at his earliest convenience. The Export Tanker's response should also confirm the requirement for the vessel to maintain safe departure draught at all times, and of the ability of the vessel to concurrently load and deballast (safely and pollution free).
β Terminals & Berths
2 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| FPSO 'Kikeh 5.8763333, 114.2934333 | Tanker | 328.58 m | 1300 m | 273,409 T | Active |
Mooring SpecsSide: Bow Gangway: Ship OperatorMDPX Sdn Bhd | |||||
| FPSO 'Kikeh 5.8768833, 114.2933833 | Tanker | β | β | β | β |
OperatorMDPX Sdn Bhd | |||||
π’ Registered Agencies & Contacts
2 contacts registered.
Ben Line Agencies
Port AgencyPIC: Asrul Sharul
Address: No. 392, First Floor Lorong 1, Taman Sejati 2 32000 Sitiawan, Perak Malaysia
Phone: +60 126833630, +60 56915071
Kikeh Marine Terminal
Port AuthorityβοΈ Airports in the Area
Labuan Airport
LBU
Labuan