Butinge Marine Terminal (LTBOT)
📍 56.0333 N, 20.9500 E 🕐 GMT +2 🌍 Lithuania
Max Length260 m
Max Beam80 m
Max Draft16 m
Max DWT150,000 T
Density1006
ISPS✓
ECA✓
📋 Port Overview
✓ ISPS✓ ECA
The Butinge Terminal is connected to the Polotsk-Mazeikiai oil pipeline running from oil-field's in Western Siberia and Western Urals via Belarus. The terminal is open for operations 24 hours per day throughout the year if weather conditions permit. A 91km 22in (550mm) onshore pipeline connecting the Mazeikiu Refinery pumping station to Butinge Terminal.
🚢 Cargo Capabilities
Liquid
Load line zone
Summer Zone for vessels over 100m in length and Winter Seasonal Area for vessels of 100m or less in length. Winter Nov 1 to Mar 31, Summer Apr 1 to Oct 31.
Location
The Butinge Marine Terminal located in an all-year-round ice-free area of the Baltic Sea.
Max size
SBM: Draught 15.0m, tankers up to 120,000DWT and draught 16.0m for tankers 120,000-150,000DWT. Segregated ballast. Largest vessel handled: "Front Birch", 149,999DWT.
Traffic figures
Approximate 9,900,000t of crude oil are handled annually.
🔧 Facilities
24/7 ✓
🛡️ Pre-Arrival Information
Communications
VHF: Terminal: Ch 16, 71. Tel: +370 44 393420 (office hours), Fax: +370 44 393429. Email: marine@orlenlietuva.lt. Control Room: Tel: +370 44 393459, Fax: +370 44 393486. Klaipeda VTS/Pilots: Klaipeda Radio 5: Ch 09, 16. Tel +370 46 499691. Fax: +370 46 499672.
Customs and Immigration
Customs/Immigration clearances inward and outward will be the responsibility of vessel's agent. Harbour dues and terminal dues will be paid by the vessel's agent. Loading will not commence until payment of these dues has been effected.
Documentation required
Early arrival and Early Departure Procedure is in place at the Butinge Terminal. Through the use of modern communication equipment, the tanker's master and his agency are able to exchange the necessary paperwork. Bills of Lading and documents: The terminal will prepare all the necessary documentation required for the particular parcel or parcels loaded. Bills of Lading, Cargo Manifest, Quality and Quantity Report, Certification of Origin are all computerised. The tanker Time Sheet will be completed by the loading master and Loading Report will be completed onboard by the loading surveyor.
ETA
Vessels should send ETA 72, 48 and 12 hours in advance. Klaipeda VTS should be notified of any movement to and from the SPM.
Flags
Lithuanian National flag to be flown at the foremast once vessel enters Lithuanian waters.
General notices & regulations
Valve operation guidelines: The avoidance of excessive surge pressure and subsequent damage to the environment and vessel's piping is the primary focus of this section. These guidelines are listed to provide a common understanding of requirements and to avoid unnecessary confusion and delays prior to loading (or discharge). Vessel Loading Operations: Oil being loaded shall be allowed to flow unrestricted to tanks aboard the receiving vessel with controlled and selective distribution via the vessels distribution manifolds. The following guidelines must be followed if possible. Vessels are expected to advise the specific area with which they cannot comply as soon as possible: ..... 1. All vessel mainline valves required for loading must be placed in the open position prior to commencement of operations. 2. Vessel mainline valves must only be closed under no-flow conditions. Prior to closing, the loading master must be notified, terminal pumps requested to be stopped and flow confirmed stopped, before a mainline valve is shut. 3. Mainline automatic valves must be set for closing in 40 seconds or longer and will be subject to the same closing procedures as other mainline valves. 4. Distribution manifold valve(s) must be fully open before a corresponding valve on the same distribution manifold is closed. Particular care must be taken during topping up. 5. All turn butterfly, wafer, ball or other such valves which are required to be open (or closed) during discharge and receiving operations and which are in the mainline flow paths or which can be isolated as a single in-line valve, shall be locked or lashed open (or closed). Vessel Discharge Operations: Oil being discharged from a vessel shall be allowed to flow unrestricted with controlled and selective distribution to storage tanks via the terminal distribution manifolds. The following are guidelines: ..... 1. Terminal and SPM valves required for receiving vessel-discharged oil will be placed in the open position prior to or at the start of operations. 2. Terminal or Pipe Line End Manifold (PLEM) mainline valves shall only be closed under no-flow conditions. The discharging vessel control room shall be notified, vessel pumps requested to be stopped and flow confirmed stopped before terminal mainline or PLEM valves are shut. 3. Terminal mainline automatic valves shall be set for closing in 60 seconds or more and will be subject to the same closing procedures as other mainline valves. The PLEM valves can be shut in 30 seconds, however PLEM valves will be shut only after vessel pumps have been stopped. Distribution manifold valve(s) shall be fully open on the same manifold run before a corresponding valve on the same manifold is closed. Particular care shall be taken during topping up tanks. 4. Distribution manifold valve(s) shall be fully open on the same manifold run before a corresponding valve on the same manifold is closed. Particular care shall be taken during topping up tanks. 5. All turn butterfly, wafer, ball or other such valves which are required to be open (or closed) during loading and in the mainline flow paths or which can be isolated as a single in-line valve, shall be locked or lashed open (or closed). Emergency Shut Down (ESD): ESD-Vessel loading operations: During a vessel's loading operation ESD's will be initiated by: The loading master (if an offshore incident or condition). The loading master will have the capability of initiating an ESD from the Portable Unit (PU) which he carries onboard. He can also initiate an ESD via radio to the Butinge Control Room. If the vessel requires loading to be stopped on an emergency or urgent basis, the vessel shall request of the loading master that appropriate action be taken based on the incident. The loading master will assess the situation and initiate one of the following: ..... 1. The Butinge Control Room (if a terminal or onshore pipeline incident or situatation) 2. Initiate an ESD from offshore (Closing PLEM valves), (and confirming action to allow tracking of the offshore and onshore ESD functions by the Butinge Control Room) 3. Request via radio that an onshore ESD or urgent shut down be initiated, with loading pumps stopped and appropriate onshore valves closed from the Terminal Control Room. Control Room advises loading master when complete, loading master co-ordinates with tanker control room. If the Butinge Terminal, pump stations, valve or metering stations experience an ESD or urgent shut down situation, the Butinge Control Room may initiate an onshore ESD or urgent shut down. If an ESD is initiated, the Butinge Control Room will advise the loading master who will co-ordinate appropriate activities by the vessel control room. If flow is stopped, the vessel will standby awaiting resumption of operations. Prior to resuming loading operations, the loading master will co-ordinate start-up initialisation procedures with the Butinge Control Room and vessel control rooms as if for start of loading operations, as above. Prior to resuming loading, the loading master and vessel representatives will again inspect and prepare the vessel and co-ordinate with the Butinge Terminal Control Room as if for start-up and resumption of loading operations. ESD - Vessel Discharge Operations: ESDs during a vessel discharge operation will be initiated by: The Vessel Control Room (if an emergency or urgent situation arises on the vessel). The tanker control room will stop pumping and secure shipboard valves as rapidly as possible. The tanker control room will advise the loading master of the onboard situation requiring this action as soon as possible. The loading master will co-ordinate communications with the Butinge Terminal Control Room that discharge pumping has terminated and to recommend appropriate actions. The loading master (if a floating hose, SPM or Offshore Pipeline Situation). When first knowing of the situation with the floating hoses, SPM or offshore pipeline which requires an ESD or urgent shutdown from the vessel, the loading master will first contact the tanker control room and request an ESD of the tanker pumps and valves consistent with securing the discharge of product in a safe and controlled manner. The loading master will immediately assess the situation and depending on the severity of the situation will determine whether or not to initiate an ESD with the PU to close the PLEM valves. Before initiating the PU ESD the loading master will ascertain that the vessel pumps have been tripped, at which time he may initiate an ESD to close the PLEM valves. Whatever is done, the loading master will co-ordinate activities with the Butinge Control Room and vessel control room. If flow is stopped, the vessel will standby awaiting advice that the situation has cleared prior to resuming operations. The loading master will investigate the situation and determine the appropriate course of action. Prior to resuming discharge, the loading master will co-ordinate start-up initialisation procedures with the Butinge Control Room and vessel control rooms as if for start of discharge operations as above. Prior to resuming discharge operations, the loading master and vessel representatives will again inspect and prepare the vessel and co-ordinate with the Butinge Terminal Control Room for the start-up and resumption of discharge and receiving operations. Loading Operations: All tankers are required to load the required amount of cargo compatible with the safe operation of the ship including allowable draught prior to discharging any ballast. The amount loaded should be at least similar to that of the ballast to be discharged ensuring that the vessel remains within the parameters mentioned under "Arrival draught". The loading operations are therefore usually carried out in three stages via: ..... 1. Load the maximum cargo compatible with vessel's stability and structural stresses. 2. Deballast 3. Load the balance of cargo. Provided the vessel can maintain a satisfactory two valve separation on board between crude and ballast systems, simultaneous operations will be permitted. Prior to loading tankers on the SPM it may be required to accept the water content of the floating hose string either to: ..... 1. A slop tank 2. A dirty ballast tank 3. An empty tank. Tankers are reminded of the necessity of draining main oil loading lines of water prior to loading/discharging. Discharge Operations: Particular attention is drawn to the "Arrival draught" section to ensure the vessel remains manoeuvrable at all times. masters are advised that when loading ballast, at no time are the ballast tanks to be overflowed. Crude oil washing may be permitted at the terminal subject to prior approval of the loading master and always in compliance with ISGOTT requirements. Ballast Operations: All ballast for discharge must be segregated and clean. Vessels shall arrive with clean segregated ballast for discharge. It is recommended to have Baltic Sea or North Sea water ballast. Any deadfreight incurred will be to the vessel's account and should not be chargeable to Butinge Terminal. Ballast discharge will be monitored and if contaminants are discovered, vessels will be fined according to Lithuanian law. Vessel inspection: A vessel inspection may be performed according to SOLAS 74, MARPOL 73/78, STCW 78, LL66, TONAGE 69 by the Lithuanian Port State Control. Early Deaprture Procedure: ..... a. The tanker's master shall be required to authorise his agent to sign any Bill of Lading on his behalf and may tender any Letter of Protest to the Butinge Terminal by telex, facsimile, electronic mail directly or via the loading master. b. The loading hoses shall be disconnected and the tanker unmoored. c. The cargo loaded figure is computed initially by the terminal, with a provisional density figure. d. The API and figures for sediment and water shall be determined by the Terminal through laboratory analysis. The gross and net oil figures for cargo loaded shall be calculated and passed on to the tanker's master as soon as possible after having received the information by modern means of communication. e. The cargo surveyor will complete his calculations onboard the tanker, verify his figures with the shore figures. If the result is not within the required tolerance, the cargo surveyor re-checks his calculations until an agreement is reached and then returns to the terminal with the loading master and other personnel on board not sailing with the tanker. f. The tanker is then released from any obligations to the Butinge Terminal and may commence her voyage. g. The final gross and net oil figures will then be introduced to the Bill of Lading in the designated section. h. These figures shall then be sent to the master for confirmation, who if in agreement, should then authorise his agent to sign on his behalf.
Health regulations
The master should report the state of health of the crew in his first message to the Agent and /or Butinge Terminal. At the terminal a Medivac evacuation/ contingency plan is available.
Notices of readiness
Tankers are not arrived for NOR until they are at the Butinge Anchorage and ready to berth. Notice of Readiness will be accepted provided the vessel is in all respects ready to load and subject to the following conditions: ..... 1. The SPM is open (this decision shall be communicated to the master by the loading master). 2. a. The vessel is secured to the SPM loading /discharging facility, or b. At the start of the nominated date the vessel is anchored within the anchorage awaiting a berth, or c. The vessel has arrived and anchored within the nominated loading dates. 3. The vessel must arrive with all cargo tanks fully inerted. The oxygen content should not be more than 8% by volume with atmosphere being maintained at positive pressure. NB: It should be borne in mind that acceptance of NOR is contingent upon complete compliance with all the requirements of the port conditions and acceptance of conditions of use. NOR will not be accepted if the vessel is unable to comply with the Ship/ Shore Safety Check List. State of Readiness: Main engines and essential machinery must be maintained in a state of readiness, which will permit immediate unberthing in an emergency situation. A vessel may be required to vacate the berth if the loading master, after due consultation with Butinge Terminal's marine operations manager, deems it necessary. Adequate shipboard personnel must be available for all operations and any emergency situation. Masters are advised that ship-supervised crew members are required for all mooring and hose connecting duties, The loading master may observe and monitor this operation but will not supervise.
Standard messages
Standard message to crude oil export vessels (initial visit): The following details to be advised: ..... AAA ETA, arrival and sailing draughts. BBB Quantity of cargo to load in bbls at 60° F. CCC Grade of previous cargo. DDD Quantity of cargo tank ballast and positions uplifted (not applicable). EEE Quantity and origin of segregated ballast and position uplifted. FFF Quantity and type of ballast for discharge ashore (not applicable). GGG Last port and destination. HHH Is inert gas system fully operational with cargo tanks all inerted? JJJ Oxygen level and H2S level in cargo tanks (the max H2S permitted is 10ppm) KKK Gross, net and summer DWT tonnage LLL Max loading rate in mі/hr. MMM Total time for deballast NNN Number and size of cargo manifolds OOO Availability of reducers to adapt manifolds to suit 12in 150 ASA flanges. PPP Vessel must load and deballast concurrently while maintaining a minimum of two valves separation QQQ Is vessel equipped with a patent OCIMF approved tongue type stopper capable of accepting a 76mm end link, and a SWL of 200t? RRR Vessel shall provide ship-supervised crew to handle mooring and hose handling duties. For SPM cargo hoses handling operations a min 10t SWL derrick is required on the port side. Two crude lines are available at SPM. When berthing to SPM, and if possible to do so, provision is to be made to haul pick up line (attached to mooring chain) on to a mooring wire storage drum. This will require the mooring wire usually stored in this position to be removed from its normal position. Pollution: Attention is drawn to the serious view taken by Port and Terminal Authorities of pollution. Heavy fines are imposed to which is added the cost of clean up operations. All crew members must understand and comply with pollution regulations. Principal pollution causes are leaking valves, overboard discharge valves and cargo or bunker overflows. It is recommended that sea valves, overboard discharges and bilge discharges are checked tight. Prior to arrival, cargo and bunkering procedures should be reviewed with chief officer and chief engineer. All scuppers to be plugged. Terms and Conditions to use the terminal are laid down in the Conditions of Use of Terminal. Please confirm acceptance of Conditions of Use of Terminal.
⚓ Terminals & Berths
2 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| Butinge Oil Terminal 56.0598167, 21.1053167 | Tanker | — | — | — | — |
OperatorOrlen Lietuva | |||||
| SPM Butinge 56.0463833, 20.9601 | Tanker | — | 22 m | 150,000 T | Active |
Mooring SpecsSide: Port Gangway: Ship OperatorOrlen Lietuva | |||||
🏢 Registered Agencies & Contacts
4 contacts registered.
Western Ships Agency
Port AgencyPIC: Andrius Grigas
Address: Minijos str. 180, LT-93269, Klaipeda, Lithuania
Email: andrius.grigas@wsy.lt
Phone: +370 61001055
Mazeikiu Nafta Butinge Branch
Port OperatorAddress: Pasventupio Kelias 21, 00309 Palanga, Lithuania
Tel: +370 463 96420
Fax: +370 463 96429
Email: marine@nafta.lt
Klaipeda State Seaport Authori
Port AuthorityAddress: J Janonio Str 24-1, 92251 Klaipeda, Lithuania
Tel: +370 46 499799
Fax: +370 46 499777
Email: info@port.lt
Website: http://www.portofklaipeda.lt