MySeaTime — Professional Sea‑Service Tracker

Liverpool Bay Terminal (GBLIB)

📍 53.6833 N, -3.5500 E 🕐 GMT 🌍 United Kingdom of Great Britain and Northern Ireland

Max Length—
Max Beam—
Max Draft—
Max DWT—
ISPS✗
ECA✗

📋 Port Overview

✗ ISPS✗ ECA
The Liverpool Bay Terminal comprises 5 oil and gas fields, plus the offshore and onshore facilities which have been put in place to tap these reserves. The development has a projected life of at least 20 years and is expected to peak at 80,000bbls/day. As of 2023, the gas fields within Liverpool Bay are approaching the end of their productive lives. The fields have an estimated carbon dioxide storage capacity of over 170 million tonnes and as a result Eni was awarded a licence for the appraisal and storage of CO2. Eni have planned the reutilisation of three of the Liverpool Bay depleted gas fields as CO2 reservoirs for injection and storage (Hamilton, Hamilton North and Lennox Gas Fields). It will use a combination of hydrogen energy and CCS (carbon capture and storage) to reduce the UK's greenhouse gas emission by 2050 and starting in the mid-2020s. There are 6 fixed installations. Two installations in the Hamilton (connected Hamilton East subsea gas well is no longer in production) and Hamilton North fields produce gas, while the Lennox installation produces both oil and gas, and the Douglas installation produces oil. The Douglas central processing complex and the oil storage installation (OSI), which is a SPM system mounted on the stern of a storage barge, are the only manned installations in the development. From 2021, Eni UK limited became the Production Licence Operator of the Conwy Development, located 33km N off the coast of Wales and connected to the Douglas Complex via a 12km, 8in diameter subsea pipeline. Gas from the Hamilton and Hamilton North fields is also fed to the Douglas complex for sweetening before being transferred via a 34km pipeline to the gas processing terminal and administration complex at Point of Ayr (POA) in N Wales. Oil from the Lennox and Douglas fields is processed on the Douglas complex. Hydrogen sulphide and mercaptan in the unstabilised crude are reduced to levels which are acceptable for handling. The stabilised crude is then transferred to FSO 'OSI' some 10nm to the N, prior to its eventual export. FSO 'OSI' has a LOA of 207m, beam of 44.5m, a helipad and consists of three deck levels. There are 10 oil compartments (as well as two slop tanks) surrounded by 4.8 metre wide seawater ballast tanks.

🚢 Cargo Capabilities

Liquid

Load line zone

North Atlantic Winter Seasonal Zone II, Winter Nov 1 to Mar 31, Summer Apr 1 to Oct 31.

Location

Liverpool Bay Terminal oil field is located in the Irish Sea, equidistant from the coasts of N Wales and W of England.

Max size

Offshore: LOA 300m, BCM 158m, draught 12.5m and 150,000DWT.

🔧 Facilities

Repairs ✗Crew Change ✗

Other ports in United Kingdom of Great Britain and Northern Ireland

See all United Kingdom of Great Britain and Northern Ireland ports