Macae (BRMEA)
π -22.3833 N, -41.7666 E π GMT -3 π Brazil
Max Length70 m
Max Beamβ
Max Draft5.7 m
Max DWTβ
Density1025
ISPSβ
ECAβ
π Port Overview
β ISPSβ ECA
Port of Macae also known as Port of Imbetiba Macae operated by Petrobras. Main cargo shipped in the port are chemicals, food, tubular equipment, subsea equipment and construction and assembly materials.
π’ Cargo Capabilities
LiquidBreakbulk
Load line zone
Tropical.
Location
Macae is located 6nm NW of Ponta do Forte.
Max size
Draught 5.7m.
Traffic figures
Approximate 715,000t of cargo are handled yearly.
π§ Facilities
π Pilot Requirements
Body
MACAΠ 22Β°23.08'S 41Β°46.09'W UNCTAD LOCODE: BR MEA ________________________________________________________________________________ ___________
Body2
WEEKLY CORRECTIONS FROM UKHO NtM WEEK 06/22 Brazilian Bulletin 21/21 & Port of MacaΠΉ website, (RSDRA2021000318621 & RSDRA2022000001334), 6/22
π‘οΈ Pre-Arrival Information
Health regulations
Ship Sanitation Control Certificates (SSCC) and Ship Sanitation Control Exemption Certificates (SSCEC) documents are issued at the port.
β Terminals & Berths
7 berths registered.
| Berth Name | Facility Type | Max LOA | Max Draft | Max DWT | Status |
|---|---|---|---|---|---|
| A1 Pier -22.38555, -41.7675333 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Port Gangway: Ship OperatorPetrobras Exploration and Production (E&P) | |||||
| A2 Pier -22.3854833, -41.7676667 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Starboard Gangway: Ship OperatorPetrobras Exploration and Production (E&P) | |||||
| B1 Pier -22.3852333, -41.7681167 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Port Gangway: Ship Cargo HandlingSteel Products OperatorPetrobras Exploration and Production (E&P) | |||||
| B2 Pier -22.38515, -41.76825 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Starboard Gangway: Ship OperatorPetrobras Exploration and Production (E&P) | |||||
| C1 Pier -22.3849167, -41.7687167 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Port Gangway: Ship OperatorPetrobras Exploration and Production (E&P) | |||||
| C2 Pier -22.38485, -41.7688667 | Both | β | 5.7 m | β | Active |
Mooring SpecsFlat Side: 90 m Side: Starboard Gangway: Ship OperatorPetrobras Exploration and Production (E&P) | |||||
| Petrobras Terminal -22.3883167, -41.7698167 | Both | β | β | β | β |
OperatorPetrobras Exploration and Production (E&P) | |||||
π’ Registered Agencies & Contacts
2 contacts registered.
Port Authority of Macae
Port AuthorityβοΈ Airports in the Area
MacaΓ© Benedito Lacerda Airport
MEA
MacaΓ©