MySeaTime — Professional Sea‑Service Tracker

Rio Cullen (ARRIC)

📍 -52.8000 N, -68.1830 E 🕐 GMT -3 🌍 Argentina

Max Length230 m
Max Beam—
Max Draft—
Max DWT150,000 T
Density1025
ISPS✓
ECA✗

📋 Port Overview

✓ ISPS✗ ECA
The Hidra field is located 13km offshore from Cullen and N of San Sebastian Bay, Argentina. The field forms part of the concession exploited by Total in partnership with Panamerican Energy & Wintershall, the operators are Total Austral. The Hidra complex consists of 2 fixed wellhead platforms, Hidra North and Hidra Centre, and two submarines wellheads Argo l and ll, interconnected by a submarine pipeline and similarly interconnected from Hidra Centre to the processing and storage terminal on shore at Cullen. Oil, gas and water are pumped ashore for processing and the oil is thereafter stored and returned to the SBM for tanker loading. Production at the buoy is presently averaging 800,000mі/year. Cargo destination is regional market and export. Hidra North is located at position 52°49.2'S., 068°13.2'W. Hidra Centre is located at position 52°50.2'S., 068°10.8'W. Agro l and ll subsea production wellheads located at position 52°43.7'S., 068° 12.9'W.

🚢 Cargo Capabilities

Liquid

Load line zone

Southern Winter Seasonal Zone, Winter Apr 16 to Oct 15, Summer Oct 16 to Apr 15.

Location

Rio Cullen Marine Terminal is located in the province of Tierra del Fuego in Austral Marine Basin No 2 (CAM 2 Hidra/Carina Field), Argentina.

Max size

Max offshore LOA 229.16m, BCM 116m, draught 15.0m and 150,000DWT.

🔧 Facilities

Bunkering ✗Fresh Water ✗Stores ✗Repairs ✗24/7 ✓Fumigation ✗Crew Change ✗Visitors ✓

✈️ Airports in the Area

Gobernador Ramón Trejo Noel International Airport RGA
Rio Grande

Other ports in Argentina

See all Argentina ports